Preliminary Project for the Rehabilitation of the Mineral Loading Dock (Almería) 2007

1st Prize in Competition.

Our proposal for the loading dock establishes a series of routes both inside the building and on the upper part occupied by the tracks, creating loop circulations, so that it functions as a true promenade-viewpoint towards the city and our bay. To provoke and activate the circulations, at the end of the loading dock there is a café-restaurant with splendid sea views. Additionally, the routes incorporate spaces for temporary exhibitions. It is therefore, a project that deeply respects the existing building, equipping it with the minimal necessary elements that turn it into a meeting and relationship place for citizens, without distorting its current image.

TECHNICAL DATA

Project: Mineral Loading Dock Rehabilitation Project (Cable Inglés)
Architect: José Ángel Ferrer, Miguel San Millán and Ramón de Torres
Developer: Department of Culture of the Regional Government of Andalusia
Location: Almería
Constructed area: 2,257.75 m²