{"id":125904,"date":"2025-05-12T22:19:51","date_gmt":"2025-05-12T21:19:51","guid":{"rendered":"https:\/\/ferrerarquitectos.com\/project-new\/project-and-construction-management-of-ceip-in-alomartes-granada-2013\/"},"modified":"2026-05-25T18:05:40","modified_gmt":"2026-05-25T17:05:40","slug":"project-and-management-of-ceip-in-alomartes-granada-2013","status":"publish","type":"project-new","link":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/","title":{"rendered":"Project and Construction Management of CEIP in Alomartes (Granada) 2013"},"content":{"rendered":"<p data-start=\"231\" data-end=\"419\">The building is conceived as a compact educational facility composed of two C-shaped volumes that separate nursery and primary education while maintaining a unified architectural identity.<\/p>\n<p data-start=\"421\" data-end=\"687\">Access is provided through a porch leading to a central lobby, illuminated both by the entrance and an internal courtyard. From this point, the differentiated circulation routes for nursery, primary education, administration, and the gymnasium are clearly organized.<\/p>\n<p data-start=\"689\" data-end=\"851\">The nursery wing is oriented to the south and directly connected to the outdoor classrooms and play area, fostering an immediate relationship with the open space.<\/p>\n<p data-start=\"853\" data-end=\"1065\">The primary education wing is developed over two levels: the ground floor concentrates shared functions and flexible classrooms, while the first floor accommodates multipurpose classrooms and sanitary facilities.<\/p>\n<p data-start=\"1067\" data-end=\"1266\">The construction is resolved through white, horizontal, and precise volumes, perforated by glazed bands that introduce natural light and establish visual connections with the landscaped surroundings.<\/p>\n<p data-start=\"1268\" data-end=\"1462\" data-is-last-node=\"\" data-is-only-node=\"\">The gymnasium is integrated into the complex as an attached volume, positioned alongside the sports court and exterior areas, reinforcing a functional, clear, and efficient spatial organization.<\/p>\n<p data-start=\"1649\" data-end=\"1924\"><strong data-start=\"1444\" data-end=\"1462\">TECHNICAL DATA<\/strong><\/p>\n<ul>\n<li data-start=\"1464\" data-end=\"1717\">BUILDING: CEIP (2013)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">PROJECT ARCHITECT: JOS\u00c9 \u00c1NGEL FERRER<\/li>\n<li data-start=\"1464\" data-end=\"1717\">CLIENT: REGIONAL GOVERNMENT OF ANDALUSIA<\/li>\n<li data-start=\"1464\" data-end=\"1717\">LOCATION: ALOMARTES, \u00cdLLORA (GRANADA)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">GROSS FLOOR AREA: 2.167 m\u00b2<\/li>\n<\/ul>\n","protected":false},"featured_media":127731,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"categoria_proyecto":[92],"class_list":["post-125904","project-new","type-project-new","status-publish","has-post-thumbnail","hentry","categoria_proyecto-education"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Project and Construction Management of CEIP in Alomartes (Granada) 2013 - Ferrer Arquitectos<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project and Construction Management of CEIP in Alomartes (Granada) 2013 - Ferrer Arquitectos\" \/>\n<meta property=\"og:description\" content=\"The building is conceived as a compact educational facility composed of two C-shaped volumes that separate nursery and primary education while maintaining a unified architectural identity. Access is provided through a porch leading to a central lobby, illuminated both by the entrance and an internal courtyard. From this point, the differentiated circulation routes for nursery, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrer Arquitectos\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-25T17:05:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-00-1024x1024.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-management-of-ceip-in-alomartes-granada-2013\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-management-of-ceip-in-alomartes-granada-2013\\\/\",\"name\":\"Project and Construction Management of CEIP in Alomartes (Granada) 2013 - Ferrer Arquitectos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-management-of-ceip-in-alomartes-granada-2013\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-management-of-ceip-in-alomartes-granada-2013\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/CEIS-NTRA-SRA-D-LOS-DOLORES-00.jpg\",\"datePublished\":\"2025-05-12T21:19:51+00:00\",\"dateModified\":\"2026-05-25T17:05:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-management-of-ceip-in-alomartes-granada-2013\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-management-of-ceip-in-alomartes-granada-2013\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-management-of-ceip-in-alomartes-granada-2013\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/CEIS-NTRA-SRA-D-LOS-DOLORES-00.jpg\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/CEIS-NTRA-SRA-D-LOS-DOLORES-00.jpg\",\"width\":2048,\"height\":2048},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-management-of-ceip-in-alomartes-granada-2013\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project and Construction Management of CEIP in Alomartes (Granada) 2013\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"name\":\"Ferrer Arquitectos\",\"description\":\"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.\",\"publisher\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferrerarquitectos.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\",\"name\":\"Ferrer Arquitectos\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"width\":32,\"height\":32,\"caption\":\"Ferrer Arquitectos\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project and Construction Management of CEIP in Alomartes (Granada) 2013 - Ferrer Arquitectos","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/","og_locale":"en_US","og_type":"article","og_title":"Project and Construction Management of CEIP in Alomartes (Granada) 2013 - Ferrer Arquitectos","og_description":"The building is conceived as a compact educational facility composed of two C-shaped volumes that separate nursery and primary education while maintaining a unified architectural identity. Access is provided through a porch leading to a central lobby, illuminated both by the entrance and an internal courtyard. From this point, the differentiated circulation routes for nursery, [&hellip;]","og_url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/","og_site_name":"Ferrer Arquitectos","article_modified_time":"2026-05-25T17:05:40+00:00","og_image":[{"width":1024,"height":1024,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-00-1024x1024.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/","url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/","name":"Project and Construction Management of CEIP in Alomartes (Granada) 2013 - Ferrer Arquitectos","isPartOf":{"@id":"https:\/\/ferrerarquitectos.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/#primaryimage"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/#primaryimage"},"thumbnailUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-00.jpg","datePublished":"2025-05-12T21:19:51+00:00","dateModified":"2026-05-25T17:05:40+00:00","breadcrumb":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/#primaryimage","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-00.jpg","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-00.jpg","width":2048,"height":2048},{"@type":"BreadcrumbList","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-management-of-ceip-in-alomartes-granada-2013\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferrerarquitectos.com\/"},{"@type":"ListItem","position":2,"name":"Project and Construction Management of CEIP in Alomartes (Granada) 2013"}]},{"@type":"WebSite","@id":"https:\/\/ferrerarquitectos.com\/#website","url":"https:\/\/ferrerarquitectos.com\/","name":"Ferrer Arquitectos","description":"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.","publisher":{"@id":"https:\/\/ferrerarquitectos.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferrerarquitectos.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ferrerarquitectos.com\/#organization","name":"Ferrer Arquitectos","url":"https:\/\/ferrerarquitectos.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","width":32,"height":32,"caption":"Ferrer Arquitectos"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/"}}]}},"meta_box":{"imagenes":[{"width":150,"height":150,"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01.jpg","filesize":2212100,"sizes":{"medium":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":29117,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-300x226.jpg"},"large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":151579,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-1024x770.jpg"},"thumbnail":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":16819,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-150x150.jpg"},"medium_large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":98765,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-768x578.jpg"},"1536x1536":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":298589,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-1536x1155.jpg"},"et-pb-post-main-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":35996,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":141907,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-1080x675.jpg"},"et-pb-portfolio-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":38713,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":54906,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":168399,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-01-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":47290,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127728","name":"CEIS-NTRA-SRA-D-LOS-DOLORES-01.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-01.jpg","title":"CEIS NTRA SRA D LOS DOLORES 01","caption":"","description":"CEIS NTRA SRA D LOS DOLORES 01","alt":"","srcset":false},{"width":150,"height":150,"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02.jpg","filesize":1486418,"sizes":{"medium":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":22201,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-300x226.jpg"},"large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":104413,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-1024x770.jpg"},"thumbnail":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":13804,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-150x150.jpg"},"medium_large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":69062,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-768x578.jpg"},"1536x1536":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":195004,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-1536x1155.jpg"},"et-pb-post-main-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":27332,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":98467,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-1080x675.jpg"},"et-pb-portfolio-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":29212,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":39933,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":112921,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-02-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":34520,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127732","name":"CEIS-NTRA-SRA-D-LOS-DOLORES-02.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-02.jpg","title":"CEIS NTRA SRA D LOS DOLORES 02","caption":"","description":"CEIS NTRA SRA D LOS DOLORES 02","alt":"","srcset":false},{"width":150,"height":150,"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-scaled.jpg","filesize":574675,"sizes":{"medium":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":21297,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-300x112.jpg"},"large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-1024x383.jpg","width":1024,"height":383,"mime-type":"image\/jpeg","filesize":118990,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-1024x383.jpg"},"thumbnail":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":15476,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-150x150.jpg"},"medium_large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-768x287.jpg","width":768,"height":287,"mime-type":"image\/jpeg","filesize":74933,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-768x287.jpg"},"1536x1536":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":235101,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-1536x575.jpg"},"2048x2048":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-2048x767.jpg","width":2048,"height":767,"mime-type":"image\/jpeg","filesize":390686,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-2048x767.jpg"},"et-pb-post-main-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":33137,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":136624,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-1080x675.jpg"},"et-pb-portfolio-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":34683,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":48289,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-1080x404.jpg","width":1080,"height":404,"mime-type":"image\/jpeg","filesize":130595,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-1080x404.jpg"},"et-pb-gallery-module-image-portrait":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":46804,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-400x516.jpg"},"et-pb-post-main-image-fullwidth-large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-2880x1090.jpg","width":2880,"height":1090,"mime-type":"image\/jpeg","filesize":806243,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-2880x1090.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"original_image":"CEIS-NTRA-SRA-D-LOS-DOLORES-03.jpg","ID":"127726","name":"CEIS-NTRA-SRA-D-LOS-DOLORES-03-scaled.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-scaled.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-03-scaled.jpg","title":"CEIS NTRA SRA D LOS DOLORES 03","caption":"","description":"CEIS NTRA SRA D LOS DOLORES 03","alt":"","srcset":false},{"width":150,"height":150,"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-scaled.jpg","filesize":269974,"sizes":{"medium":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-300x222.jpg","width":300,"height":222,"mime-type":"image\/jpeg","filesize":13314,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-300x222.jpg"},"large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-1024x758.jpg","width":1024,"height":758,"mime-type":"image\/jpeg","filesize":50721,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-1024x758.jpg"},"thumbnail":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":11125,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-150x150.jpg"},"medium_large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-768x569.jpg","width":768,"height":569,"mime-type":"image\/jpeg","filesize":31895,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-768x569.jpg"},"1536x1536":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-1536x1138.jpg","width":1536,"height":1138,"mime-type":"image\/jpeg","filesize":102237,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-1536x1138.jpg"},"2048x2048":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-2048x1517.jpg","width":2048,"height":1517,"mime-type":"image\/jpeg","filesize":177504,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-2048x1517.jpg"},"et-pb-post-main-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":15693,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":53873,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-1080x675.jpg"},"et-pb-portfolio-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":16413,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":20036,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-1080x800.jpg","width":1080,"height":800,"mime-type":"image\/jpeg","filesize":56872,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-1080x800.jpg"},"et-pb-gallery-module-image-portrait":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":21678,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-400x516.jpg"},"et-pb-post-main-image-fullwidth-large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-2880x1800.jpg","width":2880,"height":1800,"mime-type":"image\/jpeg","filesize":311275,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-2880x1800.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"original_image":"CEIS-NTRA-SRA-D-LOS-DOLORES-04.jpg","ID":"127734","name":"CEIS-NTRA-SRA-D-LOS-DOLORES-04-scaled.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-scaled.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-04-scaled.jpg","title":"CEIS NTRA SRA D LOS DOLORES 04","caption":"","description":"CEIS NTRA SRA D LOS DOLORES 04","alt":"","srcset":false},{"width":150,"height":150,"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-scaled.jpg","filesize":353456,"sizes":{"medium":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-300x232.jpg","width":300,"height":232,"mime-type":"image\/jpeg","filesize":14174,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-300x232.jpg"},"large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-1024x792.jpg","width":1024,"height":792,"mime-type":"image\/jpeg","filesize":52508,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-1024x792.jpg"},"thumbnail":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":11519,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-150x150.jpg"},"medium_large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-768x594.jpg","width":768,"height":594,"mime-type":"image\/jpeg","filesize":32813,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-768x594.jpg"},"1536x1536":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-1536x1187.jpg","width":1536,"height":1187,"mime-type":"image\/jpeg","filesize":116095,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-1536x1187.jpg"},"2048x2048":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-2048x1583.jpg","width":2048,"height":1583,"mime-type":"image\/jpeg","filesize":208751,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-2048x1583.jpg"},"et-pb-post-main-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":16665,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":55309,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-1080x675.jpg"},"et-pb-portfolio-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":17063,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":21389,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-1080x835.jpg","width":1080,"height":835,"mime-type":"image\/jpeg","filesize":57075,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-1080x835.jpg"},"et-pb-gallery-module-image-portrait":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":22519,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-400x516.jpg"},"et-pb-post-main-image-fullwidth-large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-2880x1800.jpg","width":2880,"height":1800,"mime-type":"image\/jpeg","filesize":450861,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-2880x1800.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"original_image":"CEIS-NTRA-SRA-D-LOS-DOLORES-05.jpg","ID":"127736","name":"CEIS-NTRA-SRA-D-LOS-DOLORES-05-scaled.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-scaled.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-05-scaled.jpg","title":"CEIS NTRA SRA D LOS DOLORES 05","caption":"","description":"CEIS NTRA SRA D LOS DOLORES 05","alt":"","srcset":false},{"width":150,"height":150,"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-scaled.jpg","filesize":619160,"sizes":{"medium":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":21756,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-300x112.jpg"},"large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-1024x383.jpg","width":1024,"height":383,"mime-type":"image\/jpeg","filesize":125096,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-1024x383.jpg"},"thumbnail":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":15228,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-150x150.jpg"},"medium_large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-768x287.jpg","width":768,"height":287,"mime-type":"image\/jpeg","filesize":78553,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-768x287.jpg"},"1536x1536":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":251516,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-1536x575.jpg"},"2048x2048":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-2048x767.jpg","width":2048,"height":767,"mime-type":"image\/jpeg","filesize":418992,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-2048x767.jpg"},"et-pb-post-main-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":35856,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":162913,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-1080x675.jpg"},"et-pb-portfolio-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":37123,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":53067,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-1080x404.jpg","width":1080,"height":404,"mime-type":"image\/jpeg","filesize":137651,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-1080x404.jpg"},"et-pb-gallery-module-image-portrait":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":46634,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-400x516.jpg"},"et-pb-post-main-image-fullwidth-large":{"file":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-2880x1090.jpg","width":2880,"height":1090,"mime-type":"image\/jpeg","filesize":869651,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-2880x1090.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"original_image":"CEIS-NTRA-SRA-D-LOS-DOLORES-06.jpg","ID":"127724","name":"CEIS-NTRA-SRA-D-LOS-DOLORES-06-scaled.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-scaled.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/CEIS-NTRA-SRA-D-LOS-DOLORES-06-scaled.jpg","title":"CEIS NTRA SRA D LOS DOLORES 06","caption":"","description":"CEIS NTRA SRA D LOS DOLORES 06","alt":"","srcset":false}]},"_links":{"self":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new\/125904","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new"}],"about":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/types\/project-new"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media\/127731"}],"wp:attachment":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=125904"}],"wp:term":[{"taxonomy":"categoria_proyecto","embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/categoria_proyecto?post=125904"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}