{"id":125876,"date":"2025-05-12T22:20:18","date_gmt":"2025-05-12T21:20:18","guid":{"rendered":"https:\/\/ferrerarquitectos.com\/project-new\/preliminary-health-center-project-in-bailen-jaen-2008\/"},"modified":"2026-04-28T17:50:49","modified_gmt":"2026-04-28T16:50:49","slug":"health-center-draft-in-bailen-jaen-2008","status":"publish","type":"project-new","link":"https:\/\/ferrerarquitectos.com\/en\/project-en\/health-center-draft-in-bailen-jaen-2008\/","title":{"rendered":"Preliminary Health Center Project in Bail\u00e9n (Ja\u00e9n) 2008"},"content":{"rendered":"<p data-start=\"89\" data-end=\"345\">The building is defined as a horizontal piece of exposed concrete, clearly set within the landscape, composed of cantilevered planes that provide shade, climatic protection and a recognisable institutional image, reinforced by the transparency of the base.<\/p>\n<p data-start=\"347\" data-end=\"628\">Access is resolved through a porticoed route that extends the threshold and anticipates the internal organisation. Longitudinal circulation structures the programme in a clear and hierarchical manner, facilitating orientation and ensuring the efficient functioning of the building.<\/p>\n<p data-start=\"630\" data-end=\"886\">Natural light articulates the project through courtyards and skylights that introduce controlled zenithal light, creating intermediate waiting areas with the presence of vegetation, enhancing environmental comfort and humanising the healthcare environment.<\/p>\n<p data-start=\"888\" data-end=\"1125\">From a constructive standpoint, the building is based on a clear systems logic, where the exposed concrete structure is expressed with precision and complemented by glazed enclosures and timber elements that adjust the scale to the user.<\/p>\n<p data-start=\"1127\" data-end=\"1343\">The relationship with the context is established through large glazed surfaces that frame the landscape, integrating the building into its surroundings and reinforcing visual continuity between interior and exterior.<\/p>\n<p data-start=\"1444\" data-end=\"1462\"><strong data-start=\"1444\" data-end=\"1462\">TECHNICAL DATA<\/strong><\/p>\n<ul>\n<li data-start=\"1464\" data-end=\"1717\">BUILDING: HEALTH CENTRE IN BAIL\u00c9N (2008)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">PROJECT ARCHITECT (BASIC DESIGN): JOS\u00c9 \u00c1NGEL FERRER<\/li>\n<li data-start=\"1464\" data-end=\"1717\">CLIENT: REGIONAL GOVERNMENT OF ANDALUSIA<\/li>\n<li data-start=\"1464\" data-end=\"1717\">LOCATION: BAIL\u00c9N, M\u00c1LAGA<\/li>\n<li data-start=\"1464\" data-end=\"1717\">GROSS FLOOR AREA: 4.008 m2<\/li>\n<\/ul>\n","protected":false},"featured_media":127315,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"categoria_proyecto":[99],"class_list":["post-125876","project-new","type-project-new","status-publish","has-post-thumbnail","hentry","categoria_proyecto-health"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Preliminary Health Center Project in Bail\u00e9n (Ja\u00e9n) 2008 - Ferrer Arquitectos<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Preliminary Health Center Project in Bail\u00e9n (Ja\u00e9n) 2008 - Ferrer Arquitectos\" \/>\n<meta property=\"og:description\" content=\"The building is defined as a horizontal piece of exposed concrete, clearly set within the landscape, composed of cantilevered planes that provide shade, climatic protection and a recognisable institutional image, reinforced by the transparency of the base. Access is resolved through a porticoed route that extends the threshold and anticipates the internal organisation. Longitudinal circulation [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrer Arquitectos\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-28T16:50:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/centro-salud-bailen-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t<meta property=\"og:image:height\" content=\"472\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\\\/\",\"name\":\"Preliminary Health Center Project in Bail\u00e9n (Ja\u00e9n) 2008 - Ferrer Arquitectos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-10.jpg\",\"datePublished\":\"2025-05-12T21:20:18+00:00\",\"dateModified\":\"2026-04-28T16:50:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-10.jpg\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-10.jpg\",\"width\":1702,\"height\":1702},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Anteproyecto de Centro de Salud en Bail\u00e9n (Ja\u00e9n) 2008\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"name\":\"Ferrer Arquitectos\",\"description\":\"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.\",\"publisher\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferrerarquitectos.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\",\"name\":\"Ferrer Arquitectos\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"width\":32,\"height\":32,\"caption\":\"Ferrer Arquitectos\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Preliminary Health Center Project in Bail\u00e9n (Ja\u00e9n) 2008 - Ferrer Arquitectos","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/","og_locale":"en_US","og_type":"article","og_title":"Preliminary Health Center Project in Bail\u00e9n (Ja\u00e9n) 2008 - Ferrer Arquitectos","og_description":"The building is defined as a horizontal piece of exposed concrete, clearly set within the landscape, composed of cantilevered planes that provide shade, climatic protection and a recognisable institutional image, reinforced by the transparency of the base. Access is resolved through a porticoed route that extends the threshold and anticipates the internal organisation. Longitudinal circulation [&hellip;]","og_url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/","og_site_name":"Ferrer Arquitectos","article_modified_time":"2026-04-28T16:50:49+00:00","og_image":[{"width":900,"height":472,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/centro-salud-bailen-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/","url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/","name":"Preliminary Health Center Project in Bail\u00e9n (Ja\u00e9n) 2008 - Ferrer Arquitectos","isPartOf":{"@id":"https:\/\/ferrerarquitectos.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/#primaryimage"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/#primaryimage"},"thumbnailUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-10.jpg","datePublished":"2025-05-12T21:20:18+00:00","dateModified":"2026-04-28T16:50:49+00:00","breadcrumb":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/#primaryimage","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-10.jpg","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-10.jpg","width":1702,"height":1702},{"@type":"BreadcrumbList","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-bailen-jaen-2008\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferrerarquitectos.com\/"},{"@type":"ListItem","position":2,"name":"Anteproyecto de Centro de Salud en Bail\u00e9n (Ja\u00e9n) 2008"}]},{"@type":"WebSite","@id":"https:\/\/ferrerarquitectos.com\/#website","url":"https:\/\/ferrerarquitectos.com\/","name":"Ferrer Arquitectos","description":"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.","publisher":{"@id":"https:\/\/ferrerarquitectos.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferrerarquitectos.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ferrerarquitectos.com\/#organization","name":"Ferrer Arquitectos","url":"https:\/\/ferrerarquitectos.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","width":32,"height":32,"caption":"Ferrer Arquitectos"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/"}}]}},"meta_box":{"imagenes":[{"width":150,"height":150,"file":"01.NIVEL-01-12.jpg","filesize":1450672,"sizes":{"medium":{"file":"01.NIVEL-01-12-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":25898,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-300x226.jpg"},"large":{"file":"01.NIVEL-01-12-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":139708,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-1024x770.jpg"},"thumbnail":{"file":"01.NIVEL-01-12-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":15685,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-150x150.jpg"},"medium_large":{"file":"01.NIVEL-01-12-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":88513,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-768x578.jpg"},"1536x1536":{"file":"01.NIVEL-01-12-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":271237,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-1536x1155.jpg"},"et-pb-post-main-image":{"file":"01.NIVEL-01-12-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":32341,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"01.NIVEL-01-12-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":133553,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-1080x675.jpg"},"et-pb-portfolio-image":{"file":"01.NIVEL-01-12-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":34505,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"01.NIVEL-01-12-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":48570,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"01.NIVEL-01-12-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":151694,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"01.NIVEL-01-12-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":41000,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127320","name":"01.NIVEL-01-12.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/01.NIVEL-01-12.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-12.jpg","title":"Centro salud Bailen - 01","caption":"","description":"Centro salud Bailen - 01","alt":"","srcset":false},{"width":150,"height":150,"file":"02.NIVEL-01-13.jpg","filesize":2322039,"sizes":{"medium":{"file":"02.NIVEL-01-13-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":20881,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-300x226.jpg"},"large":{"file":"02.NIVEL-01-13-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":102513,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-1024x770.jpg"},"thumbnail":{"file":"02.NIVEL-01-13-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":13772,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-150x150.jpg"},"medium_large":{"file":"02.NIVEL-01-13-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":65894,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-768x577.jpg"},"1536x1536":{"file":"02.NIVEL-01-13-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":204301,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-1536x1155.jpg"},"2048x2048":{"file":"02.NIVEL-01-13-2048x1540.jpg","width":2048,"height":1540,"mime-type":"image\/jpeg","filesize":344910,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-2048x1540.jpg"},"et-pb-post-main-image":{"file":"02.NIVEL-01-13-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":26165,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"02.NIVEL-01-13-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":98458,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-1080x675.jpg"},"et-pb-portfolio-image":{"file":"02.NIVEL-01-13-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":27273,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"02.NIVEL-01-13-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":37496,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"02.NIVEL-01-13-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":112393,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"02.NIVEL-01-13-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":37136,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127332","name":"02.NIVEL-01-13.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/02.NIVEL-01-13.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-13.jpg","title":"Centro salud Bailen - 02","caption":"","description":"Centro salud Bailen - 02","alt":"","srcset":false},{"width":150,"height":150,"file":"03.NIVEL-02-12.jpg","filesize":1519018,"sizes":{"medium":{"file":"03.NIVEL-02-12-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":15617,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-300x112.jpg"},"large":{"file":"03.NIVEL-02-12-1024x384.jpg","width":1024,"height":384,"mime-type":"image\/jpeg","filesize":63991,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-1024x384.jpg"},"thumbnail":{"file":"03.NIVEL-02-12-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":12613,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-150x150.jpg"},"medium_large":{"file":"03.NIVEL-02-12-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":42859,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-768x288.jpg"},"1536x1536":{"file":"03.NIVEL-02-12-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":119767,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-1536x575.jpg"},"2048x2048":{"file":"03.NIVEL-02-12-2048x767.jpg","width":2048,"height":767,"mime-type":"image\/jpeg","filesize":198719,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-2048x767.jpg"},"et-pb-post-main-image":{"file":"03.NIVEL-02-12-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":23492,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"03.NIVEL-02-12-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":92047,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-1080x675.jpg"},"et-pb-portfolio-image":{"file":"03.NIVEL-02-12-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":24978,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"03.NIVEL-02-12-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":34854,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"03.NIVEL-02-12-1080x405.jpg","width":1080,"height":405,"mime-type":"image\/jpeg","filesize":69346,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-1080x405.jpg"},"et-pb-gallery-module-image-portrait":{"file":"03.NIVEL-02-12-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":35518,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127330","name":"03.NIVEL-02-12.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/03.NIVEL-02-12.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-12.jpg","title":"Centro salud Bailen - 03","caption":"","description":"Centro salud Bailen - 03","alt":"","srcset":false},{"width":150,"height":150,"file":"04.NIVEL-01-9.jpg","filesize":2222258,"sizes":{"medium":{"file":"04.NIVEL-01-9-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":22112,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-300x226.jpg"},"large":{"file":"04.NIVEL-01-9-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":110458,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-1024x770.jpg"},"thumbnail":{"file":"04.NIVEL-01-9-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":14027,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-150x150.jpg"},"medium_large":{"file":"04.NIVEL-01-9-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":71768,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-768x577.jpg"},"1536x1536":{"file":"04.NIVEL-01-9-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":212305,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-1536x1155.jpg"},"2048x2048":{"file":"04.NIVEL-01-9-2048x1540.jpg","width":2048,"height":1540,"mime-type":"image\/jpeg","filesize":347614,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-2048x1540.jpg"},"et-pb-post-main-image":{"file":"04.NIVEL-01-9-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":27197,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"04.NIVEL-01-9-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":104619,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-1080x675.jpg"},"et-pb-portfolio-image":{"file":"04.NIVEL-01-9-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":29085,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"04.NIVEL-01-9-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":40595,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"04.NIVEL-01-9-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":120643,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"04.NIVEL-01-9-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":38880,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127328","name":"04.NIVEL-01-9.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/04.NIVEL-01-9.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-9.jpg","title":"Centro salud Bailen - 04","caption":"","description":"Centro salud Bailen - 04","alt":"","srcset":false},{"width":150,"height":150,"file":"05.NIVEL-01-9.jpg","filesize":2521439,"sizes":{"medium":{"file":"05.NIVEL-01-9-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":23824,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-300x226.jpg"},"large":{"file":"05.NIVEL-01-9-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":125496,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-1024x770.jpg"},"thumbnail":{"file":"05.NIVEL-01-9-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":15266,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-150x150.jpg"},"medium_large":{"file":"05.NIVEL-01-9-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":79687,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-768x577.jpg"},"1536x1536":{"file":"05.NIVEL-01-9-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":249239,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-1536x1155.jpg"},"2048x2048":{"file":"05.NIVEL-01-9-2048x1540.jpg","width":2048,"height":1540,"mime-type":"image\/jpeg","filesize":420941,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-2048x1540.jpg"},"et-pb-post-main-image":{"file":"05.NIVEL-01-9-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":29898,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"05.NIVEL-01-9-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":119882,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-1080x675.jpg"},"et-pb-portfolio-image":{"file":"05.NIVEL-01-9-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":31749,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"05.NIVEL-01-9-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":44500,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"05.NIVEL-01-9-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":136141,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"05.NIVEL-01-9-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":46975,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127326","name":"05.NIVEL-01-9.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/05.NIVEL-01-9.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-9.jpg","title":"Centro salud Bailen - 05","caption":"","description":"Centro salud Bailen - 05","alt":"","srcset":false},{"width":150,"height":150,"file":"06.NIVEL-02-8-scaled.jpg","filesize":266404,"sizes":{"medium":{"file":"06.NIVEL-02-8-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":16013,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-300x112.jpg"},"large":{"file":"06.NIVEL-02-8-1024x383.jpg","width":1024,"height":383,"mime-type":"image\/jpeg","filesize":64926,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-1024x383.jpg"},"thumbnail":{"file":"06.NIVEL-02-8-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":12351,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-150x150.jpg"},"medium_large":{"file":"06.NIVEL-02-8-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":43592,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-768x288.jpg"},"1536x1536":{"file":"06.NIVEL-02-8-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":117573,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-1536x575.jpg"},"2048x2048":{"file":"06.NIVEL-02-8-2048x767.jpg","width":2048,"height":767,"mime-type":"image\/jpeg","filesize":186578,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-2048x767.jpg"},"et-pb-post-main-image":{"file":"06.NIVEL-02-8-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":24868,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"06.NIVEL-02-8-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":89966,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-1080x675.jpg"},"et-pb-portfolio-image":{"file":"06.NIVEL-02-8-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":25459,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"06.NIVEL-02-8-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":34668,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"06.NIVEL-02-8-1080x404.jpg","width":1080,"height":404,"mime-type":"image\/jpeg","filesize":70704,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-1080x404.jpg"},"et-pb-gallery-module-image-portrait":{"file":"06.NIVEL-02-8-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":31399,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-400x516.jpg"},"et-pb-post-main-image-fullwidth-large":{"file":"06.NIVEL-02-8-2880x1192.jpg","width":2880,"height":1192,"mime-type":"image\/jpeg","filesize":390588,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-2880x1192.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"original_image":"06.NIVEL-02-8.jpg","ID":"127324","name":"06.NIVEL-02-8-scaled.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/06.NIVEL-02-8-scaled.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-8-scaled.jpg","title":"Centro salud Bailen - 06","caption":"","description":"Centro salud Bailen - 06","alt":"","srcset":false},{"width":150,"height":150,"file":"07.NIVEL-01-3.jpg","filesize":2494189,"sizes":{"medium":{"file":"07.NIVEL-01-3-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":20416,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-300x226.jpg"},"large":{"file":"07.NIVEL-01-3-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":108393,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-1024x770.jpg"},"thumbnail":{"file":"07.NIVEL-01-3-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":13274,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-150x150.jpg"},"medium_large":{"file":"07.NIVEL-01-3-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":66848,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-768x577.jpg"},"1536x1536":{"file":"07.NIVEL-01-3-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":226675,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-1536x1155.jpg"},"2048x2048":{"file":"07.NIVEL-01-3-2048x1540.jpg","width":2048,"height":1540,"mime-type":"image\/jpeg","filesize":398515,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-2048x1540.jpg"},"et-pb-post-main-image":{"file":"07.NIVEL-01-3-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":25003,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"07.NIVEL-01-3-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":102001,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-1080x675.jpg"},"et-pb-portfolio-image":{"file":"07.NIVEL-01-3-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":26789,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"07.NIVEL-01-3-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":37037,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"07.NIVEL-01-3-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":118564,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"07.NIVEL-01-3-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":36373,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127322","name":"07.NIVEL-01-3.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/07.NIVEL-01-3.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-3.jpg","title":"Centro salud Bailen - 07","caption":"","description":"Centro salud Bailen - 07","alt":"","srcset":false},{"width":150,"height":150,"file":"08.NIVEL-01-2.jpg","filesize":79577,"sizes":{"medium":{"file":"08.NIVEL-01-2-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":11598,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-2-300x226.jpg"},"thumbnail":{"file":"08.NIVEL-01-2-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":9340,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-2-150x150.jpg"},"et-pb-post-main-image":{"file":"08.NIVEL-01-2-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":14148,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-2-400x250.jpg"},"et-pb-portfolio-image":{"file":"08.NIVEL-01-2-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":14073,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-2-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"08.NIVEL-01-2-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":18181,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-2-510x382.jpg"},"et-pb-gallery-module-image-portrait":{"file":"08.NIVEL-01-2-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":20017,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-2-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127316","name":"08.NIVEL-01-2.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/08.NIVEL-01-2.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-2-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-2.jpg","title":"Centro salud Bailen - 08","caption":"","description":"Centro salud Bailen - 08","alt":"","srcset":false},{"width":150,"height":150,"file":"09.NIVEL-02-1.jpg","filesize":238924,"sizes":{"medium":{"file":"09.NIVEL-02-1-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":11885,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-300x112.jpg"},"large":{"file":"09.NIVEL-02-1-1024x384.jpg","width":1024,"height":384,"mime-type":"image\/jpeg","filesize":47352,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-1024x384.jpg"},"thumbnail":{"file":"09.NIVEL-02-1-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":10509,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-150x150.jpg"},"medium_large":{"file":"09.NIVEL-02-1-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":31432,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-768x288.jpg"},"et-pb-post-main-image":{"file":"09.NIVEL-02-1-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":19992,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"09.NIVEL-02-1-1080x553.jpg","width":1080,"height":553,"mime-type":"image\/jpeg","filesize":67398,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-1080x553.jpg"},"et-pb-portfolio-image":{"file":"09.NIVEL-02-1-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":20399,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"09.NIVEL-02-1-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":26977,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"09.NIVEL-02-1-1080x405.jpg","width":1080,"height":405,"mime-type":"image\/jpeg","filesize":51606,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-1080x405.jpg"},"et-pb-gallery-module-image-portrait":{"file":"09.NIVEL-02-1-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":21878,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127318","name":"09.NIVEL-02-1.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/09.NIVEL-02-1.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1.jpg","title":"Centro salud Bailen - 09","caption":"","description":"Centro salud Bailen - 09","alt":"","srcset":false}]},"_links":{"self":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new\/125876","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new"}],"about":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/types\/project-new"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media\/127315"}],"wp:attachment":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=125876"}],"wp:term":[{"taxonomy":"categoria_proyecto","embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/categoria_proyecto?post=125876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}