{"id":125869,"date":"2025-05-12T22:20:23","date_gmt":"2025-05-12T21:20:23","guid":{"rendered":"https:\/\/ferrerarquitectos.com\/project-new\/preliminary-health-center-project-in-archidona-malaga-2008\/"},"modified":"2026-04-28T17:29:41","modified_gmt":"2026-04-28T16:29:41","slug":"health-center-preliminary-project-in-archidona-malaga-2008","status":"publish","type":"project-new","link":"https:\/\/ferrerarquitectos.com\/en\/project-en\/health-center-preliminary-project-in-archidona-malaga-2008\/","title":{"rendered":"Preliminary Draft of Health Center in Archidona (Malaga) 2008"},"content":{"rendered":"<p data-start=\"92\" data-end=\"384\">The health centre is conceived as a composition of white prismatic volumes, clearly set within their surroundings, conveying a sober and recognisable institutional image. A continuous envelope organises the building and establishes a balance between public presence and a user-friendly scale.<\/p>\n<p data-start=\"386\" data-end=\"669\">Access is resolved through a hierarchy of routes that intuitively guide users, separating flows and preventing interference between different uses. Inside, the layout is based on linear circulation paths and associated waiting areas, ensuring functional clarity and easy orientation.<\/p>\n<p data-start=\"671\" data-end=\"949\">Natural light is introduced through rhythmic openings and strategically placed courtyards, providing uniform illumination and environmental comfort in consulting rooms and common areas. These elements enhance spatial quality and contribute to the building\u2019s natural ventilation.<\/p>\n<p data-start=\"951\" data-end=\"1219\">From a construction standpoint, the project is executed using massive systems with high thermal inertia and a continuous envelope that reinforces its unified character. The flat roof integrates building services without altering the overall perception of the building.<\/p>\n<p data-start=\"1221\" data-end=\"1437\">Overall, the project integrates lighting, circulation, construction and context into an efficient solution, where spatial clarity and environmental quality optimise the building\u2019s performance and the user experience.<\/p>\n<p data-start=\"1444\" data-end=\"1462\"><strong data-start=\"1444\" data-end=\"1462\">TECHNICAL DATA<\/strong><\/p>\n<ul>\n<li data-start=\"1464\" data-end=\"1717\">BUILDING: HEALTH CENTRE (2008)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">PROJECT ARCHITECT &amp; SITE DIRECTOR: JOS\u00c9 \u00c1NGEL FERRER<\/li>\n<li data-start=\"1464\" data-end=\"1717\">CLIENT: REGIONAL GOVERNMENT OF ANDALUSIA \u2013 NORTHERN M\u00c1LAGA HEALTH DISTRICT MANAGEMENT<\/li>\n<li data-start=\"1464\" data-end=\"1717\">LOCATION: ARCHIDONA (M\u00c1LAGA)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">GROSS FLOOR AREA: 2,518 m\u00b2<\/li>\n<\/ul>\n","protected":false},"featured_media":127352,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"categoria_proyecto":[99],"class_list":["post-125869","project-new","type-project-new","status-publish","has-post-thumbnail","hentry","categoria_proyecto-health"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Preliminary Draft of Health Center in Archidona (Malaga) 2008 - Ferrer Arquitectos<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Preliminary Draft of Health Center in Archidona (Malaga) 2008 - Ferrer Arquitectos\" \/>\n<meta property=\"og:description\" content=\"The health centre is conceived as a composition of white prismatic volumes, clearly set within their surroundings, conveying a sober and recognisable institutional image. A continuous envelope organises the building and establishes a balance between public presence and a user-friendly scale. Access is resolved through a hierarchy of routes that intuitively guide users, separating flows [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrer Arquitectos\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-28T16:29:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/archidona-1-copia-3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\\\/\",\"name\":\"Preliminary Draft of Health Center in Archidona (Malaga) 2008 - Ferrer Arquitectos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-12.jpg\",\"datePublished\":\"2025-05-12T21:20:23+00:00\",\"dateModified\":\"2026-04-28T16:29:41+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-12.jpg\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-12.jpg\",\"width\":2048,\"height\":2048},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Anteproyecto de Centro de Salud en Archidona (M\u00e1laga) 2008\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"name\":\"Ferrer Arquitectos\",\"description\":\"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.\",\"publisher\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferrerarquitectos.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\",\"name\":\"Ferrer Arquitectos\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"width\":32,\"height\":32,\"caption\":\"Ferrer Arquitectos\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Preliminary Draft of Health Center in Archidona (Malaga) 2008 - Ferrer Arquitectos","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/","og_locale":"en_US","og_type":"article","og_title":"Preliminary Draft of Health Center in Archidona (Malaga) 2008 - Ferrer Arquitectos","og_description":"The health centre is conceived as a composition of white prismatic volumes, clearly set within their surroundings, conveying a sober and recognisable institutional image. A continuous envelope organises the building and establishes a balance between public presence and a user-friendly scale. Access is resolved through a hierarchy of routes that intuitively guide users, separating flows [&hellip;]","og_url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/","og_site_name":"Ferrer Arquitectos","article_modified_time":"2026-04-28T16:29:41+00:00","og_image":[{"width":2000,"height":1000,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/archidona-1-copia-3.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/","url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/","name":"Preliminary Draft of Health Center in Archidona (Malaga) 2008 - Ferrer Arquitectos","isPartOf":{"@id":"https:\/\/ferrerarquitectos.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/#primaryimage"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/#primaryimage"},"thumbnailUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-12.jpg","datePublished":"2025-05-12T21:20:23+00:00","dateModified":"2026-04-28T16:29:41+00:00","breadcrumb":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/#primaryimage","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-12.jpg","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-12.jpg","width":2048,"height":2048},{"@type":"BreadcrumbList","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-de-centro-de-salud-en-archidona-malaga-2008\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferrerarquitectos.com\/"},{"@type":"ListItem","position":2,"name":"Anteproyecto de Centro de Salud en Archidona (M\u00e1laga) 2008"}]},{"@type":"WebSite","@id":"https:\/\/ferrerarquitectos.com\/#website","url":"https:\/\/ferrerarquitectos.com\/","name":"Ferrer Arquitectos","description":"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.","publisher":{"@id":"https:\/\/ferrerarquitectos.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferrerarquitectos.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ferrerarquitectos.com\/#organization","name":"Ferrer Arquitectos","url":"https:\/\/ferrerarquitectos.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","width":32,"height":32,"caption":"Ferrer Arquitectos"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/"}}]}},"meta_box":{"imagenes":[{"width":150,"height":150,"file":"01.NIVEL-01-14.jpg","filesize":2482928,"sizes":{"medium":{"file":"01.NIVEL-01-14-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":29491,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-300x226.jpg"},"large":{"file":"01.NIVEL-01-14-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":173422,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-1024x770.jpg"},"thumbnail":{"file":"01.NIVEL-01-14-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":17014,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-150x150.jpg"},"medium_large":{"file":"01.NIVEL-01-14-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":108644,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-768x578.jpg"},"1536x1536":{"file":"01.NIVEL-01-14-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":359744,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-1536x1155.jpg"},"et-pb-post-main-image":{"file":"01.NIVEL-01-14-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":35313,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"01.NIVEL-01-14-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":151972,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-1080x675.jpg"},"et-pb-portfolio-image":{"file":"01.NIVEL-01-14-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":39366,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"01.NIVEL-01-14-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":57277,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"01.NIVEL-01-14-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":193009,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"01.NIVEL-01-14-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":52534,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127355","name":"01.NIVEL-01-14.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/01.NIVEL-01-14.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-14.jpg","title":"ARCHIDONA - 01","caption":"","description":"ARCHIDONA - 01","alt":"","srcset":false},{"width":150,"height":150,"file":"02.NIVEL-01-15.jpg","filesize":1998760,"sizes":{"medium":{"file":"02.NIVEL-01-15-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":20928,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-300x226.jpg"},"large":{"file":"02.NIVEL-01-15-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":121260,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-1024x770.jpg"},"thumbnail":{"file":"02.NIVEL-01-15-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":13160,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-150x150.jpg"},"medium_large":{"file":"02.NIVEL-01-15-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":73708,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-768x577.jpg"},"1536x1536":{"file":"02.NIVEL-01-15-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":247881,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-1536x1155.jpg"},"et-pb-post-main-image":{"file":"02.NIVEL-01-15-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":25724,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"02.NIVEL-01-15-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":110061,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-1080x675.jpg"},"et-pb-portfolio-image":{"file":"02.NIVEL-01-15-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":27673,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"02.NIVEL-01-15-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":39589,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"02.NIVEL-01-15-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":131968,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"02.NIVEL-01-15-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":39217,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127359","name":"02.NIVEL-01-15.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/02.NIVEL-01-15.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-15.jpg","title":"ARCHIDONA - 02","caption":"","description":"ARCHIDONA - 02","alt":"","srcset":false},{"width":150,"height":150,"file":"03.NIVEL-02-14.jpg","filesize":549901,"sizes":{"medium":{"file":"03.NIVEL-02-14-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":18148,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-300x112.jpg"},"large":{"file":"03.NIVEL-02-14-1024x384.jpg","width":1024,"height":384,"mime-type":"image\/jpeg","filesize":89852,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-1024x384.jpg"},"thumbnail":{"file":"03.NIVEL-02-14-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":14564,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-150x150.jpg"},"medium_large":{"file":"03.NIVEL-02-14-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":57460,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-768x288.jpg"},"et-pb-post-main-image":{"file":"03.NIVEL-02-14-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":31496,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"03.NIVEL-02-14-1080x565.jpg","width":1080,"height":565,"mime-type":"image\/jpeg","filesize":135299,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-1080x565.jpg"},"et-pb-portfolio-image":{"file":"03.NIVEL-02-14-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":33788,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"03.NIVEL-02-14-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":48363,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"03.NIVEL-02-14-1080x405.jpg","width":1080,"height":405,"mime-type":"image\/jpeg","filesize":98382,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-1080x405.jpg"},"et-pb-gallery-module-image-portrait":{"file":"03.NIVEL-02-14-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":49564,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127353","name":"03.NIVEL-02-14.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/03.NIVEL-02-14.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-14.jpg","title":"ARCHIDONA - 03","caption":"","description":"ARCHIDONA - 03","alt":"","srcset":false},{"width":150,"height":150,"file":"04.NIVEL-01-11.jpg","filesize":1360238,"sizes":{"medium":{"file":"04.NIVEL-01-11-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":26161,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-300x226.jpg"},"large":{"file":"04.NIVEL-01-11-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":140940,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-1024x770.jpg"},"thumbnail":{"file":"04.NIVEL-01-11-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":15632,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-150x150.jpg"},"medium_large":{"file":"04.NIVEL-01-11-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":90030,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-768x578.jpg"},"1536x1536":{"file":"04.NIVEL-01-11-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":270778,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-1536x1155.jpg"},"et-pb-post-main-image":{"file":"04.NIVEL-01-11-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":32082,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"04.NIVEL-01-11-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":130525,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-1080x675.jpg"},"et-pb-portfolio-image":{"file":"04.NIVEL-01-11-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":34564,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"04.NIVEL-01-11-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":49140,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"04.NIVEL-01-11-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":153140,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"04.NIVEL-01-11-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":44956,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127361","name":"04.NIVEL-01-11.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/04.NIVEL-01-11.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-11.jpg","title":"ARCHIDONA - 04","caption":"","description":"","alt":"","srcset":false},{"width":150,"height":150,"file":"05.NIVEL-01-11.jpg","filesize":1936849,"sizes":{"medium":{"file":"05.NIVEL-01-11-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":22058,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-300x226.jpg"},"large":{"file":"05.NIVEL-01-11-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":113458,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-1024x770.jpg"},"thumbnail":{"file":"05.NIVEL-01-11-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":14041,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-150x150.jpg"},"medium_large":{"file":"05.NIVEL-01-11-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":71411,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-768x577.jpg"},"1536x1536":{"file":"05.NIVEL-01-11-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":229026,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-1536x1155.jpg"},"et-pb-post-main-image":{"file":"05.NIVEL-01-11-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":26854,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"05.NIVEL-01-11-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":104424,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-1080x675.jpg"},"et-pb-portfolio-image":{"file":"05.NIVEL-01-11-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":28878,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"05.NIVEL-01-11-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":40086,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"05.NIVEL-01-11-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":123249,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"05.NIVEL-01-11-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":39528,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127357","name":"05.NIVEL-01-11.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/05.NIVEL-01-11.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-11.jpg","title":"ARCHIDONA - 05","caption":"","description":"ARCHIDONA - 05","alt":"","srcset":false}]},"_links":{"self":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new\/125869","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new"}],"about":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/types\/project-new"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media\/127352"}],"wp:attachment":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=125869"}],"wp:term":[{"taxonomy":"categoria_proyecto","embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/categoria_proyecto?post=125869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}