{"id":125865,"date":"2025-05-12T22:20:27","date_gmt":"2025-05-12T21:20:27","guid":{"rendered":"https:\/\/ferrerarquitectos.com\/project-new\/preliminary-project-for-piedras-redondas-health-center-almeria-2008\/"},"modified":"2026-05-11T16:57:29","modified_gmt":"2026-05-11T15:57:29","slug":"preliminary-project-of-health-center-of-piedras-redondas-almeria-2008","status":"publish","type":"project-new","link":"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/","title":{"rendered":"Preliminary Project for Piedras Redondas Health Center (Almer\u00eda) 2008"},"content":{"rendered":"<p data-start=\"73\" data-end=\"448\">The project is set out through an aggregation of low-rise horizontal volumes that are fragmented and adapted to the scale of the surroundings, avoiding an excessive massing. This strategy creates a gradual transition between the urban space and the building, relying on courtyards and voids that incorporate vegetation and blur the boundary between the built and the natural.<\/p>\n<p data-start=\"450\" data-end=\"805\">Circulation is organised through a clear spatial sequence, where intermediate spaces\u2014courtyards and transition areas\u2014act as structuring elements. Access unfolds gradually towards a central space, from which perimeter circulation routes are distributed, always visually connected to the exterior, facilitating orientation and enhancing the user experience.<\/p>\n<p data-start=\"807\" data-end=\"1183\">Natural light is conceived as the primary design resource, through the combination of large glazed surfaces, internal courtyards and linear skylights. The incorporation of vertical timber screens allows solar radiation to be controlled, producing a soft, filtered and homogeneous light that enhances the interior spaces and introduces atmospheric variation throughout the day.<\/p>\n<p data-start=\"1185\" data-end=\"1647\">From a constructive standpoint, the building is resolved through a coherent system based on the combination of exposed concrete, timber and glass. Concrete provides an institutional character and material continuity; timber introduces warmth and a human scale; and glass enhances transparency and the relationship between interior and exterior. All of this is developed under a modular system that rationalises construction and reinforces the unity of the whole.<\/p>\n<p data-start=\"1649\" data-end=\"1924\">Overall, the project achieves a balance between institutional representativeness and user proximity, through a sober and precise architecture in which light, circulation and materiality are integrated to create a continuous, legible spatial experience adapted to its context.<\/p>\n<p data-start=\"1649\" data-end=\"1924\"><strong data-start=\"1444\" data-end=\"1462\">TECHNICAL DATA<\/strong><\/p>\n<ul>\n<li data-start=\"1464\" data-end=\"1717\">BUILDING: PIEDRAS REDONDAS HEALTH CENTRE (2008)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">PROJECT ARCHITECT (BASIC DESIGN): JOS\u00c9 \u00c1NGEL FERRER<\/li>\n<li data-start=\"1464\" data-end=\"1717\">CLIENT: REGIONAL GOVERNMENT OF ANDALUSIA<\/li>\n<li data-start=\"1464\" data-end=\"1717\">LOCATION: PIEDRAS REDONDAS (ALMER\u00cdA)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">GROSS FLOOR AREA: 1.668 m\u00b2<\/li>\n<\/ul>\n","protected":false},"featured_media":127270,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"categoria_proyecto":[99],"class_list":["post-125865","project-new","type-project-new","status-publish","has-post-thumbnail","hentry","categoria_proyecto-health"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Preliminary Project for Piedras Redondas Health Center (Almer\u00eda) 2008 - Ferrer Arquitectos<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Preliminary Project for Piedras Redondas Health Center (Almer\u00eda) 2008 - Ferrer Arquitectos\" \/>\n<meta property=\"og:description\" content=\"The project is set out through an aggregation of low-rise horizontal volumes that are fragmented and adapted to the scale of the surroundings, avoiding an excessive massing. This strategy creates a gradual transition between the urban space and the building, relying on courtyards and voids that incorporate vegetation and blur the boundary between the built [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrer Arquitectos\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-11T15:57:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-6.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1021\" \/>\n\t<meta property=\"og:image:height\" content=\"1021\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\\\/\",\"name\":\"Preliminary Project for Piedras Redondas Health Center (Almer\u00eda) 2008 - Ferrer Arquitectos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-6.jpg\",\"datePublished\":\"2025-05-12T21:20:27+00:00\",\"dateModified\":\"2026-05-11T15:57:29+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-6.jpg\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-6.jpg\",\"width\":1021,\"height\":1021},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Preliminary Project for Piedras Redondas Health Center (Almer\u00eda) 2008\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"name\":\"Ferrer Arquitectos\",\"description\":\"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.\",\"publisher\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferrerarquitectos.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\",\"name\":\"Ferrer Arquitectos\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"width\":32,\"height\":32,\"caption\":\"Ferrer Arquitectos\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Preliminary Project for Piedras Redondas Health Center (Almer\u00eda) 2008 - Ferrer Arquitectos","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/","og_locale":"en_US","og_type":"article","og_title":"Preliminary Project for Piedras Redondas Health Center (Almer\u00eda) 2008 - Ferrer Arquitectos","og_description":"The project is set out through an aggregation of low-rise horizontal volumes that are fragmented and adapted to the scale of the surroundings, avoiding an excessive massing. This strategy creates a gradual transition between the urban space and the building, relying on courtyards and voids that incorporate vegetation and blur the boundary between the built [&hellip;]","og_url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/","og_site_name":"Ferrer Arquitectos","article_modified_time":"2026-05-11T15:57:29+00:00","og_image":[{"width":1021,"height":1021,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-6.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/","url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/","name":"Preliminary Project for Piedras Redondas Health Center (Almer\u00eda) 2008 - Ferrer Arquitectos","isPartOf":{"@id":"https:\/\/ferrerarquitectos.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/#primaryimage"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/#primaryimage"},"thumbnailUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-6.jpg","datePublished":"2025-05-12T21:20:27+00:00","dateModified":"2026-05-11T15:57:29+00:00","breadcrumb":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/#primaryimage","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-6.jpg","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-6.jpg","width":1021,"height":1021},{"@type":"BreadcrumbList","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/preliminary-project-of-health-center-of-piedras-redondas-almeria-2008\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferrerarquitectos.com\/"},{"@type":"ListItem","position":2,"name":"Preliminary Project for Piedras Redondas Health Center (Almer\u00eda) 2008"}]},{"@type":"WebSite","@id":"https:\/\/ferrerarquitectos.com\/#website","url":"https:\/\/ferrerarquitectos.com\/","name":"Ferrer Arquitectos","description":"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.","publisher":{"@id":"https:\/\/ferrerarquitectos.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferrerarquitectos.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ferrerarquitectos.com\/#organization","name":"Ferrer Arquitectos","url":"https:\/\/ferrerarquitectos.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","width":32,"height":32,"caption":"Ferrer Arquitectos"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/"}}]}},"meta_box":{"imagenes":[{"width":150,"height":150,"file":"01.NIVEL-01-8.jpg","filesize":1185439,"sizes":{"medium":{"file":"01.NIVEL-01-8-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":33201,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-300x226.jpg"},"large":{"file":"01.NIVEL-01-8-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":201482,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-1024x770.jpg"},"thumbnail":{"file":"01.NIVEL-01-8-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":19403,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-150x150.jpg"},"medium_large":{"file":"01.NIVEL-01-8-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":125393,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-768x578.jpg"},"et-pb-post-main-image":{"file":"01.NIVEL-01-8-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":43119,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"01.NIVEL-01-8-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":195673,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-1080x675.jpg"},"et-pb-portfolio-image":{"file":"01.NIVEL-01-8-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":45883,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"01.NIVEL-01-8-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":65766,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"01.NIVEL-01-8-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":220492,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"01.NIVEL-01-8-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":59741,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127265","name":"01.NIVEL-01-8.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/01.NIVEL-01-8.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-8.jpg","title":"Piedras Redondas - 01","caption":"","description":"Piedras Redondas - 01","alt":"","srcset":false},{"width":150,"height":150,"file":"02.NIVEL-01-9.jpg","filesize":887968,"sizes":{"medium":{"file":"02.NIVEL-01-9-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":26321,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-300x226.jpg"},"large":{"file":"02.NIVEL-01-9-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":146461,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-1024x770.jpg"},"thumbnail":{"file":"02.NIVEL-01-9-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":15983,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-150x150.jpg"},"medium_large":{"file":"02.NIVEL-01-9-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":92163,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-768x577.jpg"},"et-pb-post-main-image":{"file":"02.NIVEL-01-9-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":32882,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"02.NIVEL-01-9-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":134565,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-1080x675.jpg"},"et-pb-portfolio-image":{"file":"02.NIVEL-01-9-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":35215,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"02.NIVEL-01-9-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":49828,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"02.NIVEL-01-9-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":159188,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"02.NIVEL-01-9-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":48304,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127267","name":"02.NIVEL-01-9.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/02.NIVEL-01-9.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-9.jpg","title":"Piedras Redondas - 02","caption":"","description":"Piedras Redondas - 02","alt":"","srcset":false},{"width":150,"height":150,"file":"03.NIVEL-02-8-scaled.jpg","filesize":284955,"sizes":{"medium":{"file":"03.NIVEL-02-8-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":7169,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-300x112.jpg"},"large":{"file":"03.NIVEL-02-8-1024x384.jpg","width":1024,"height":384,"mime-type":"image\/jpeg","filesize":54658,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-1024x384.jpg"},"thumbnail":{"file":"03.NIVEL-02-8-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":4129,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-150x150.jpg"},"medium_large":{"file":"03.NIVEL-02-8-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":33273,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-768x288.jpg"},"1536x1536":{"file":"03.NIVEL-02-8-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":114191,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-1536x575.jpg"},"2048x2048":{"file":"03.NIVEL-02-8-2048x767.jpg","width":2048,"height":767,"mime-type":"image\/jpeg","filesize":192230,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-2048x767.jpg"},"et-pb-post-main-image":{"file":"03.NIVEL-02-8-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":15643,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"03.NIVEL-02-8-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":88118,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-1080x675.jpg"},"et-pb-portfolio-image":{"file":"03.NIVEL-02-8-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":16665,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"03.NIVEL-02-8-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":25900,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"03.NIVEL-02-8-1080x405.jpg","width":1080,"height":405,"mime-type":"image\/jpeg","filesize":61391,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-1080x405.jpg"},"et-pb-gallery-module-image-portrait":{"file":"03.NIVEL-02-8-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":23047,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"original_image":"03.NIVEL-02-8.jpg","ID":"127251","name":"03.NIVEL-02-8-scaled.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/03.NIVEL-02-8-scaled.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-8-scaled.jpg","title":"Piedras Redondas - 03","caption":"","description":"Piedras Redondas - 03","alt":"","srcset":false},{"width":150,"height":150,"file":"04.NIVEL-01-7.jpg","filesize":2147349,"sizes":{"medium":{"file":"04.NIVEL-01-7-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":30342,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-300x226.jpg"},"large":{"file":"04.NIVEL-01-7-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":169023,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-1024x770.jpg"},"thumbnail":{"file":"04.NIVEL-01-7-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":18431,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-150x150.jpg"},"medium_large":{"file":"04.NIVEL-01-7-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":107431,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-768x578.jpg"},"1536x1536":{"file":"04.NIVEL-01-7-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":323634,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-1536x1155.jpg"},"2048x2048":{"file":"04.NIVEL-01-7-2048x1540.jpg","width":2048,"height":1540,"mime-type":"image\/jpeg","filesize":514376,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-2048x1540.jpg"},"et-pb-post-main-image":{"file":"04.NIVEL-01-7-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":38022,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"04.NIVEL-01-7-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":160116,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-1080x675.jpg"},"et-pb-portfolio-image":{"file":"04.NIVEL-01-7-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":40777,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"04.NIVEL-01-7-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":58465,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"04.NIVEL-01-7-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":184069,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"04.NIVEL-01-7-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":57495,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127263","name":"04.NIVEL-01-7.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/04.NIVEL-01-7.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-7.jpg","title":"Piedras Redondas - 04","caption":"","description":"Piedras Redondas - 04","alt":"","srcset":false},{"width":150,"height":150,"file":"05.NIVEL-01-7.jpg","filesize":2556701,"sizes":{"medium":{"file":"05.NIVEL-01-7-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":24001,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-300x226.jpg"},"large":{"file":"05.NIVEL-01-7-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":122565,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-1024x770.jpg"},"thumbnail":{"file":"05.NIVEL-01-7-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":14614,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-150x150.jpg"},"medium_large":{"file":"05.NIVEL-01-7-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":77202,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-768x577.jpg"},"1536x1536":{"file":"05.NIVEL-01-7-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":258548,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-1536x1155.jpg"},"2048x2048":{"file":"05.NIVEL-01-7-2048x1540.jpg","width":2048,"height":1540,"mime-type":"image\/jpeg","filesize":455238,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-2048x1540.jpg"},"et-pb-post-main-image":{"file":"05.NIVEL-01-7-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":29235,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"05.NIVEL-01-7-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":114932,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-1080x675.jpg"},"et-pb-portfolio-image":{"file":"05.NIVEL-01-7-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":31327,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"05.NIVEL-01-7-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":43131,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"05.NIVEL-01-7-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":134503,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"05.NIVEL-01-7-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":38330,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127261","name":"05.NIVEL-01-7.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/05.NIVEL-01-7.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-7.jpg","title":"Piedras Redondas - 05","caption":"","description":"Piedras Redondas - 05","alt":"","srcset":false},{"width":150,"height":150,"file":"06.NIVEL-02-6.jpg","filesize":1550986,"sizes":{"medium":{"file":"06.NIVEL-02-6-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":16297,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-300x112.jpg"},"large":{"file":"06.NIVEL-02-6-1024x384.jpg","width":1024,"height":384,"mime-type":"image\/jpeg","filesize":68736,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-1024x384.jpg"},"thumbnail":{"file":"06.NIVEL-02-6-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":13508,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-150x150.jpg"},"medium_large":{"file":"06.NIVEL-02-6-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":45451,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-768x288.jpg"},"1536x1536":{"file":"06.NIVEL-02-6-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":131095,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-1536x575.jpg"},"2048x2048":{"file":"06.NIVEL-02-6-2048x767.jpg","width":2048,"height":767,"mime-type":"image\/jpeg","filesize":219794,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-2048x767.jpg"},"et-pb-post-main-image":{"file":"06.NIVEL-02-6-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":26736,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"06.NIVEL-02-6-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":110169,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-1080x675.jpg"},"et-pb-portfolio-image":{"file":"06.NIVEL-02-6-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":28947,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"06.NIVEL-02-6-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":40572,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"06.NIVEL-02-6-1080x405.jpg","width":1080,"height":405,"mime-type":"image\/jpeg","filesize":74251,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-1080x405.jpg"},"et-pb-gallery-module-image-portrait":{"file":"06.NIVEL-02-6-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":43253,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127259","name":"06.NIVEL-02-6.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/06.NIVEL-02-6.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-6.jpg","title":"Piedras Redondas - 06","caption":"","description":"Piedras Redondas - 06","alt":"","srcset":false},{"width":150,"height":150,"file":"07.NIVEL-01-2.jpg","filesize":2029212,"sizes":{"medium":{"file":"07.NIVEL-01-2-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":23446,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-300x226.jpg"},"large":{"file":"07.NIVEL-01-2-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":105746,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-1024x770.jpg"},"thumbnail":{"file":"07.NIVEL-01-2-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":14060,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-150x150.jpg"},"medium_large":{"file":"07.NIVEL-01-2-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":70784,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-768x577.jpg"},"1536x1536":{"file":"07.NIVEL-01-2-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":198178,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-1536x1155.jpg"},"2048x2048":{"file":"07.NIVEL-01-2-2048x1540.jpg","width":2048,"height":1540,"mime-type":"image\/jpeg","filesize":327118,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-2048x1540.jpg"},"et-pb-post-main-image":{"file":"07.NIVEL-01-2-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":28525,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"07.NIVEL-01-2-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":99248,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-1080x675.jpg"},"et-pb-portfolio-image":{"file":"07.NIVEL-01-2-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":30198,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"07.NIVEL-01-2-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":41228,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"07.NIVEL-01-2-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":113920,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"07.NIVEL-01-2-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":35710,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127257","name":"07.NIVEL-01-2.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/07.NIVEL-01-2.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/07.NIVEL-01-2.jpg","title":"Piedras Redondas - 07","caption":"","description":"Piedras Redondas - 07","alt":"","srcset":false},{"width":150,"height":150,"file":"08.NIVEL-01-1.jpg","filesize":170899,"sizes":{"medium":{"file":"08.NIVEL-01-1-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":15594,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-1-300x226.jpg"},"thumbnail":{"file":"08.NIVEL-01-1-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":11614,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-1-150x150.jpg"},"medium_large":{"file":"08.NIVEL-01-1-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":45866,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-1-768x578.jpg"},"et-pb-post-main-image":{"file":"08.NIVEL-01-1-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":20380,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-1-400x250.jpg"},"et-pb-portfolio-image":{"file":"08.NIVEL-01-1-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":20501,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-1-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"08.NIVEL-01-1-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":27148,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-1-510x382.jpg"},"et-pb-gallery-module-image-portrait":{"file":"08.NIVEL-01-1-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":36048,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-1-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127255","name":"08.NIVEL-01-1.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/08.NIVEL-01-1.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-1-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/08.NIVEL-01-1.jpg","title":"Piedras Redondas - 08","caption":"","description":"Piedras Redondas - 08","alt":"","srcset":false},{"width":150,"height":150,"file":"09.NIVEL-02.jpg","filesize":259168,"sizes":{"medium":{"file":"09.NIVEL-02-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":8996,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-300x112.jpg"},"large":{"file":"09.NIVEL-02-1024x384.jpg","width":1024,"height":384,"mime-type":"image\/jpeg","filesize":33472,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1024x384.jpg"},"thumbnail":{"file":"09.NIVEL-02-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":9108,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-150x150.jpg"},"medium_large":{"file":"09.NIVEL-02-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":22478,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-768x288.jpg"},"1536x1536":{"file":"09.NIVEL-02-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":59412,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1536x575.jpg"},"et-pb-post-main-image":{"file":"09.NIVEL-02-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":17241,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"09.NIVEL-02-1080x665.jpg","width":1080,"height":665,"mime-type":"image\/jpeg","filesize":71295,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1080x665.jpg"},"et-pb-portfolio-image":{"file":"09.NIVEL-02-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":19272,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"09.NIVEL-02-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":27612,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"09.NIVEL-02-1080x405.jpg","width":1080,"height":405,"mime-type":"image\/jpeg","filesize":36009,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-1080x405.jpg"},"et-pb-gallery-module-image-portrait":{"file":"09.NIVEL-02-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":24745,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127253","name":"09.NIVEL-02.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/09.NIVEL-02.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/09.NIVEL-02.jpg","title":"Piedras Redondas - 09","caption":"","description":"Piedras Redondas - 09","alt":"","srcset":false}]},"_links":{"self":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new\/125865","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new"}],"about":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/types\/project-new"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media\/127270"}],"wp:attachment":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=125865"}],"wp:term":[{"taxonomy":"categoria_proyecto","embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/categoria_proyecto?post=125865"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}