{"id":125863,"date":"2025-05-12T22:20:29","date_gmt":"2025-05-12T21:20:29","guid":{"rendered":"https:\/\/ferrerarquitectos.com\/project-new\/preliminary-design-maternal-and-child-hospital-almeria-2008\/"},"modified":"2026-04-20T14:00:19","modified_gmt":"2026-04-20T13:00:19","slug":"anteproyecto-hospital-materno-infantil-almeria-2008","status":"publish","type":"project-new","link":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/","title":{"rendered":"Preliminary Draft Maternal and Child Hospital (Almer\u00eda) 2008"},"content":{"rendered":"<p>2nd Prize in the Competition for the Design of the New Maternal and Child Hospital<\/p>\n<p><\/p>\n<p>This project, prepared for the competition for the Maternal and Child Hospital of Almer\u00eda, proposes an implantation strictly aligned with the regulations of the current General Urban Development Plan (P.G.O.U.), as well as with the specific requirements set out in the tender specifications.<\/p>\n<p>The proposal is formalized through two differentiated building volumes, functionally and spatially linked by an elevated connecting walkway. This volumetric strategy enables an appropriate accommodation of the functional program, optimizing internal circulation and relationships, while freeing up plot area for potential future developments. This release of built surface is compensated by a localized increase in height of two additional levels. <\/p>\n<p>The building\u2019s material and spatial definition follows a unified design approach aimed at ensuring optimal conditions of comfort, legibility, and environmental control, through solutions that promote compositional clarity, formal simplicity, and an appropriate degree of asepsis, in line with the requirements of the healthcare context.<\/p>\n<p><strong>TECHNICAL SHEET<\/strong><\/p>\n<ul>\n<li>MATERNAL AND CHILD HOSPITAL BUILDING (2008)<\/li>\n<li>PROJECT ARCHITECT AND WORK DIRECTOR: JOS\u00c9 \u00c1NGEL FERRER\n<\/li>\n<li>DIRECCI\u00d3N DE EJECUCI\u00d3N DE LA OBRA &#8211;<\/li>\n<li>PROMOTED: JUNTA DE ANDALUC\u00cdA<\/li>\n<li>CONSTRUCTOR &#8211;<\/li>\n<li>LOCATION: ALMER\u00cdA, ALMER\u00cdA<\/li>\n<li>BULIT AREA: 20831 m2<\/li>\n<li>FOTOGRAF\u00cdAS &#8211;<\/li>\n<\/ul>\n","protected":false},"featured_media":127173,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"categoria_proyecto":[99],"class_list":["post-125863","project-new","type-project-new","status-publish","has-post-thumbnail","hentry","categoria_proyecto-health"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Preliminary Draft Maternal and Child Hospital (Almer\u00eda) 2008 - Ferrer Arquitectos<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Preliminary Draft Maternal and Child Hospital (Almer\u00eda) 2008 - Ferrer Arquitectos\" \/>\n<meta property=\"og:description\" content=\"2nd Prize in the Competition for the Design of the New Maternal and Child Hospital This project, prepared for the competition for the Maternal and Child Hospital of Almer\u00eda, proposes an implantation strictly aligned with the regulations of the current General Urban Development Plan (P.G.O.U.), as well as with the specific requirements set out in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrer Arquitectos\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-20T13:00:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/Render-web-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"963\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-hospital-materno-infantil-almeria-2008\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-hospital-materno-infantil-almeria-2008\\\/\",\"name\":\"Preliminary Draft Maternal and Child Hospital (Almer\u00eda) 2008 - Ferrer Arquitectos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-hospital-materno-infantil-almeria-2008\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-hospital-materno-infantil-almeria-2008\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-5.jpg\",\"datePublished\":\"2025-05-12T21:20:29+00:00\",\"dateModified\":\"2026-04-20T13:00:19+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-hospital-materno-infantil-almeria-2008\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-hospital-materno-infantil-almeria-2008\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-hospital-materno-infantil-almeria-2008\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-5.jpg\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-5.jpg\",\"width\":2400,\"height\":2400,\"caption\":\"Hospital Materno Infantil Almer\u00eda\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/anteproyecto-hospital-materno-infantil-almeria-2008\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Anteproyecto Hospital materno infantil (Almer\u00eda) 2008\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"name\":\"Ferrer Arquitectos\",\"description\":\"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.\",\"publisher\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferrerarquitectos.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\",\"name\":\"Ferrer Arquitectos\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"width\":32,\"height\":32,\"caption\":\"Ferrer Arquitectos\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Preliminary Draft Maternal and Child Hospital (Almer\u00eda) 2008 - Ferrer Arquitectos","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/","og_locale":"en_US","og_type":"article","og_title":"Preliminary Draft Maternal and Child Hospital (Almer\u00eda) 2008 - Ferrer Arquitectos","og_description":"2nd Prize in the Competition for the Design of the New Maternal and Child Hospital This project, prepared for the competition for the Maternal and Child Hospital of Almer\u00eda, proposes an implantation strictly aligned with the regulations of the current General Urban Development Plan (P.G.O.U.), as well as with the specific requirements set out in [&hellip;]","og_url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/","og_site_name":"Ferrer Arquitectos","article_modified_time":"2026-04-20T13:00:19+00:00","og_image":[{"width":2560,"height":963,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/Render-web-1-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/","url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/","name":"Preliminary Draft Maternal and Child Hospital (Almer\u00eda) 2008 - Ferrer Arquitectos","isPartOf":{"@id":"https:\/\/ferrerarquitectos.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/#primaryimage"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/#primaryimage"},"thumbnailUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-5.jpg","datePublished":"2025-05-12T21:20:29+00:00","dateModified":"2026-04-20T13:00:19+00:00","breadcrumb":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/#primaryimage","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-5.jpg","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-5.jpg","width":2400,"height":2400,"caption":"Hospital Materno Infantil Almer\u00eda"},{"@type":"BreadcrumbList","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/anteproyecto-hospital-materno-infantil-almeria-2008\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferrerarquitectos.com\/"},{"@type":"ListItem","position":2,"name":"Anteproyecto Hospital materno infantil (Almer\u00eda) 2008"}]},{"@type":"WebSite","@id":"https:\/\/ferrerarquitectos.com\/#website","url":"https:\/\/ferrerarquitectos.com\/","name":"Ferrer Arquitectos","description":"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.","publisher":{"@id":"https:\/\/ferrerarquitectos.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferrerarquitectos.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ferrerarquitectos.com\/#organization","name":"Ferrer Arquitectos","url":"https:\/\/ferrerarquitectos.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","width":32,"height":32,"caption":"Ferrer Arquitectos"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/"}}]}},"meta_box":{"imagenes":[{"width":150,"height":150,"file":"01.NIVEL-01-7.jpg","filesize":3459414,"sizes":{"medium":{"file":"01.NIVEL-01-7-300x224.jpg","width":300,"height":224,"mime-type":"image\/jpeg","filesize":31475,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-300x224.jpg"},"large":{"file":"01.NIVEL-01-7-1024x765.jpg","width":1024,"height":765,"mime-type":"image\/jpeg","filesize":178683,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-1024x765.jpg"},"thumbnail":{"file":"01.NIVEL-01-7-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":19102,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-150x150.jpg"},"medium_large":{"file":"01.NIVEL-01-7-768x573.jpg","width":768,"height":573,"mime-type":"image\/jpeg","filesize":112594,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-768x573.jpg"},"1536x1536":{"file":"01.NIVEL-01-7-1536x1147.jpg","width":1536,"height":1147,"mime-type":"image\/jpeg","filesize":354163,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-1536x1147.jpg"},"2048x2048":{"file":"01.NIVEL-01-7-2048x1529.jpg","width":2048,"height":1529,"mime-type":"image\/jpeg","filesize":585072,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-2048x1529.jpg"},"et-pb-post-main-image":{"file":"01.NIVEL-01-7-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":41589,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"01.NIVEL-01-7-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":174956,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-1080x675.jpg"},"et-pb-portfolio-image":{"file":"01.NIVEL-01-7-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":43584,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"01.NIVEL-01-7-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":61406,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"01.NIVEL-01-7-1080x806.jpg","width":1080,"height":806,"mime-type":"image\/jpeg","filesize":194070,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-1080x806.jpg"},"et-pb-gallery-module-image-portrait":{"file":"01.NIVEL-01-7-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":61235,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127176","name":"01.NIVEL-01-7.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/01.NIVEL-01-7.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/01.NIVEL-01-7.jpg","title":"Hospital Materno Infantil Almer\u00eda I","caption":"","description":"Hospital Materno Infantil Almer\u00eda I","alt":"Hospital Materno Infantil Almer\u00eda I","srcset":false},{"width":150,"height":150,"file":"02.NIVEL-01-8.jpg","filesize":3025369,"sizes":{"medium":{"file":"02.NIVEL-01-8-300x224.jpg","width":300,"height":224,"mime-type":"image\/jpeg","filesize":16194,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-300x224.jpg"},"large":{"file":"02.NIVEL-01-8-1024x765.jpg","width":1024,"height":765,"mime-type":"image\/jpeg","filesize":138326,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-1024x765.jpg"},"thumbnail":{"file":"02.NIVEL-01-8-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":6487,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-150x150.jpg"},"medium_large":{"file":"02.NIVEL-01-8-768x573.jpg","width":768,"height":573,"mime-type":"image\/jpeg","filesize":84035,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-768x573.jpg"},"1536x1536":{"file":"02.NIVEL-01-8-1536x1147.jpg","width":1536,"height":1147,"mime-type":"image\/jpeg","filesize":278340,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-1536x1147.jpg"},"2048x2048":{"file":"02.NIVEL-01-8-2048x1529.jpg","width":2048,"height":1529,"mime-type":"image\/jpeg","filesize":454816,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-2048x1529.jpg"},"et-pb-post-main-image":{"file":"02.NIVEL-01-8-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":23941,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"02.NIVEL-01-8-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":131848,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-1080x675.jpg"},"et-pb-portfolio-image":{"file":"02.NIVEL-01-8-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":26025,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"02.NIVEL-01-8-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":41367,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"02.NIVEL-01-8-1080x806.jpg","width":1080,"height":806,"mime-type":"image\/jpeg","filesize":151702,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-1080x806.jpg"},"et-pb-gallery-module-image-portrait":{"file":"02.NIVEL-01-8-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":41391,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"ID":"127174","name":"02.NIVEL-01-8.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/02.NIVEL-01-8.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/02.NIVEL-01-8.jpg","title":"Hospital Materno Infantil Almer\u00eda II","caption":"","description":"Hospital Materno Infantil Almer\u00eda II","alt":"Hospital Materno Infantil Almer\u00eda II","srcset":false},{"width":150,"height":150,"file":"03.NIVEL-02-7-scaled.jpg","filesize":191757,"sizes":{"medium":{"file":"03.NIVEL-02-7-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":13450,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-300x112.jpg"},"large":{"file":"03.NIVEL-02-7-1024x383.jpg","width":1024,"height":383,"mime-type":"image\/jpeg","filesize":41882,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-1024x383.jpg"},"thumbnail":{"file":"03.NIVEL-02-7-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":12321,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-150x150.jpg"},"medium_large":{"file":"03.NIVEL-02-7-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":28430,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-768x288.jpg"},"1536x1536":{"file":"03.NIVEL-02-7-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":78219,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-1536x575.jpg"},"2048x2048":{"file":"03.NIVEL-02-7-2048x767.jpg","width":2048,"height":767,"mime-type":"image\/jpeg","filesize":127325,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-2048x767.jpg"},"et-pb-post-main-image":{"file":"03.NIVEL-02-7-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":19069,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"03.NIVEL-02-7-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":67302,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-1080x675.jpg"},"et-pb-portfolio-image":{"file":"03.NIVEL-02-7-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":20092,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"03.NIVEL-02-7-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":26555,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"03.NIVEL-02-7-1080x404.jpg","width":1080,"height":404,"mime-type":"image\/jpeg","filesize":45229,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-1080x404.jpg"},"et-pb-gallery-module-image-portrait":{"file":"03.NIVEL-02-7-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":30318,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-400x516.jpg"},"et-pb-post-main-image-fullwidth-large":{"file":"03.NIVEL-02-7-2880x1800.jpg","width":2880,"height":1800,"mime-type":"image\/jpeg","filesize":394145,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-2880x1800.jpg"}},"image_meta":{"aperture":"0","credit":"APN","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"\\SvnodotecexpedientesExpedientes Activos\u00000836 Hospital Mater","orientation":"1","keywords":[]},"original_image":"03.NIVEL-02-7.jpg","ID":"127178","name":"03.NIVEL-02-7-scaled.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/03.NIVEL-02-7-scaled.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/03.NIVEL-02-7-scaled.jpg","title":"Hospital Materno Infantil Almer\u00eda III","caption":"","description":"Hospital Materno Infantil Almer\u00eda III","alt":"Hospital Materno Infantil Almer\u00eda III","srcset":false},{"width":150,"height":150,"file":"04.NIVEL-01-6.jpg","filesize":2586060,"sizes":{"medium":{"file":"04.NIVEL-01-6-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":31211,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-300x226.jpg"},"large":{"file":"04.NIVEL-01-6-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":212542,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-1024x770.jpg"},"thumbnail":{"file":"04.NIVEL-01-6-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":17285,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-150x150.jpg"},"medium_large":{"file":"04.NIVEL-01-6-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":130352,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-768x578.jpg"},"1536x1536":{"file":"04.NIVEL-01-6-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":430126,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-1536x1155.jpg"},"et-pb-post-main-image":{"file":"04.NIVEL-01-6-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":40192,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"04.NIVEL-01-6-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":197445,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-1080x675.jpg"},"et-pb-portfolio-image":{"file":"04.NIVEL-01-6-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":43152,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"04.NIVEL-01-6-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":64880,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"04.NIVEL-01-6-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":236480,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"04.NIVEL-01-6-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":57590,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"ID":"127180","name":"04.NIVEL-01-6.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/04.NIVEL-01-6.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/04.NIVEL-01-6.jpg","title":"Hospital Materno Infantil Almer\u00eda IV","caption":"","description":"Hospital Materno Infantil Almer\u00eda IV","alt":"Hospital Materno Infantil Almer\u00eda IV","srcset":false},{"width":150,"height":150,"file":"05.NIVEL-01-6.jpg","filesize":641113,"sizes":{"medium":{"file":"05.NIVEL-01-6-300x224.jpg","width":300,"height":224,"mime-type":"image\/jpeg","filesize":18821,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-300x224.jpg"},"large":{"file":"05.NIVEL-01-6-1024x765.jpg","width":1024,"height":765,"mime-type":"image\/jpeg","filesize":165865,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-1024x765.jpg"},"thumbnail":{"file":"05.NIVEL-01-6-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":7102,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-150x150.jpg"},"medium_large":{"file":"05.NIVEL-01-6-768x573.jpg","width":768,"height":573,"mime-type":"image\/jpeg","filesize":99245,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-768x573.jpg"},"1536x1536":{"file":"05.NIVEL-01-6-1536x1147.jpg","width":1536,"height":1147,"mime-type":"image\/jpeg","filesize":334912,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-1536x1147.jpg"},"2048x2048":{"file":"05.NIVEL-01-6-2048x1529.jpg","width":2048,"height":1529,"mime-type":"image\/jpeg","filesize":541548,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-2048x1529.jpg"},"et-pb-post-main-image":{"file":"05.NIVEL-01-6-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":26818,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"05.NIVEL-01-6-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":155147,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-1080x675.jpg"},"et-pb-portfolio-image":{"file":"05.NIVEL-01-6-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":29631,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"05.NIVEL-01-6-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":48231,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"05.NIVEL-01-6-1080x806.jpg","width":1080,"height":806,"mime-type":"image\/jpeg","filesize":182409,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-1080x806.jpg"},"et-pb-gallery-module-image-portrait":{"file":"05.NIVEL-01-6-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":45129,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"0","keywords":[]},"ID":"127182","name":"05.NIVEL-01-6.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/05.NIVEL-01-6.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/05.NIVEL-01-6.jpg","title":"Hospital Materno Infantil Almer\u00eda V","caption":"","description":"Hospital Materno Infantil Almer\u00eda V","alt":"Hospital Materno Infantil Almer\u00eda V","srcset":false},{"width":150,"height":150,"file":"06.NIVEL-02-5-scaled.jpg","filesize":204120,"sizes":{"medium":{"file":"06.NIVEL-02-5-300x113.jpg","width":300,"height":113,"mime-type":"image\/jpeg","filesize":13539,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-300x113.jpg"},"large":{"file":"06.NIVEL-02-5-1024x385.jpg","width":1024,"height":385,"mime-type":"image\/jpeg","filesize":48492,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-1024x385.jpg"},"thumbnail":{"file":"06.NIVEL-02-5-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":11768,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-150x150.jpg"},"medium_large":{"file":"06.NIVEL-02-5-768x289.jpg","width":768,"height":289,"mime-type":"image\/jpeg","filesize":33016,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-768x289.jpg"},"1536x1536":{"file":"06.NIVEL-02-5-1536x577.jpg","width":1536,"height":577,"mime-type":"image\/jpeg","filesize":87824,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-1536x577.jpg"},"2048x2048":{"file":"06.NIVEL-02-5-2048x770.jpg","width":2048,"height":770,"mime-type":"image\/jpeg","filesize":138722,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-2048x770.jpg"},"et-pb-post-main-image":{"file":"06.NIVEL-02-5-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":19964,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"06.NIVEL-02-5-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":68172,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-1080x675.jpg"},"et-pb-portfolio-image":{"file":"06.NIVEL-02-5-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":20731,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"06.NIVEL-02-5-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":27836,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"06.NIVEL-02-5-1080x406.jpg","width":1080,"height":406,"mime-type":"image\/jpeg","filesize":52856,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-1080x406.jpg"},"et-pb-gallery-module-image-portrait":{"file":"06.NIVEL-02-5-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":28399,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-400x516.jpg"},"et-pb-post-main-image-fullwidth-large":{"file":"06.NIVEL-02-5-2880x1417.jpg","width":2880,"height":1417,"mime-type":"image\/jpeg","filesize":341945,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-2880x1417.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[]},"original_image":"06.NIVEL-02-5.jpg","ID":"127184","name":"06.NIVEL-02-5-scaled.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/06.NIVEL-02-5-scaled.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/06.NIVEL-02-5-scaled.jpg","title":"06.Hospital Materno Infantil Almer\u00eda VI","caption":"","description":"","alt":"","srcset":false}]},"_links":{"self":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new\/125863","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new"}],"about":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/types\/project-new"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media\/127173"}],"wp:attachment":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=125863"}],"wp:term":[{"taxonomy":"categoria_proyecto","embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/categoria_proyecto?post=125863"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}