{"id":125849,"date":"2025-05-12T22:20:41","date_gmt":"2025-05-12T21:20:41","guid":{"rendered":"https:\/\/ferrerarquitectos.com\/project-new\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/"},"modified":"2026-06-25T19:01:20","modified_gmt":"2026-06-25T18:01:20","slug":"project-and-construction-management-of-33-homes-in-san-jose-almeria-2006","status":"publish","type":"project-new","link":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/","title":{"rendered":"Project and Construction Management of 35 homes in San Jos\u00e9 (Almer\u00eda) 2006"},"content":{"rendered":"<p class=\"PDq2pG_selectionAnchorContainer\" data-start=\"230\" data-end=\"653\"><em data-start=\"230\" data-end=\"252\">Terrazas de San Jos\u00e9<\/em> is a residential development comprising 35 dwellings in San Jos\u00e9, N\u00edjar, set on an irregular site with a pronounced slope between Calle Lepanto, Camino del Aguamarina, and Ronda de San Jos\u00e9. The site&#8217;s topography becomes the project&#8217;s defining architectural element, giving rise to a terraced composition that adapts the dwellings to the terrain while maximizing views of the Mediterranean landscape.<\/p>\n<p data-start=\"655\" data-end=\"1089\">The development consists of 34 semi-detached houses and one detached dwelling, arranged over a ground floor, first floor, semi-basement, and accessible roof terrace. Each home incorporates private courtyards, terraces, and outdoor spaces, extending domestic life outdoors and reinforcing the relationship with the climate of San Jos\u00e9. The communal facilities include a swimming pool, a covered social area, and an accessible restroom.<\/p>\n<p data-start=\"1091\" data-end=\"1501\">Natural light shapes both the image and the performance of the dwellings. The white volumes reflect the intense brightness of the surrounding environment, while generous openings, terraces, and habitable roofscapes bring daylight into the principal living spaces and open them toward the landscape. Timber elements, lattice screens, vegetation, and shaded areas moderate solar exposure while enhancing privacy.<\/p>\n<p data-start=\"1503\" data-end=\"1881\">Circulation follows a clear and domestic sequence: an independent entrance leads to an open-plan ground floor devoted to the living areas, the first floor accommodates the private sleeping quarters, and the roof functions as an elevated outdoor terrace. This vertical organization allows each dwelling to enjoy autonomy, privacy, and multiple ways of engaging with the exterior.<\/p>\n<p data-start=\"1883\" data-end=\"2297\">From a constructive perspective, the project is based on a reinforced concrete structure, retaining walls at the semi-basement level, insulated external walls, and accessible inverted flat roofs. The combination of white monocouche render, high-performance joinery, timber surfaces, and solar protection elements creates a contemporary Mediterranean architectural language technically adapted to the local climate.<\/p>\n<p data-start=\"2299\" data-end=\"2606\" data-is-last-node=\"\" data-is-only-node=\"\">Overall, <em data-start=\"2308\" data-end=\"2330\">Terrazas de San Jos\u00e9<\/em> proposes a bright, terraced residential architecture that opens toward the landscape, where topography, circulation, construction, and the natural setting are integrated to create private, comfortable homes closely connected to the outdoor lifestyle of the Almer\u00eda coastline.<\/p>\n<p data-start=\"1649\" data-end=\"1924\"><strong data-start=\"1444\" data-end=\"1462\">TECHNICAL DATA<\/strong><\/p>\n<ul>\n<li data-start=\"1464\" data-end=\"1717\">BUILDING: 35 HOUSING UNITS (2012)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">PROJECT ARCHITECT: JOS\u00c9 \u00c1NGEL FERRER<\/li>\n<li data-start=\"1464\" data-end=\"1717\">CLIENT: PRIVATE<\/li>\n<li data-start=\"1464\" data-end=\"1717\">LOCATION: SAN JOS\u00c9 (ALMER\u00cdA)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">GROSS FLOOR AREA: 5.038 m\u00b2<\/li>\n<\/ul>\n","protected":false},"featured_media":127899,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"categoria_proyecto":[89],"class_list":["post-125849","project-new","type-project-new","status-publish","has-post-thumbnail","hentry","categoria_proyecto-multifamily-housing"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Project and Construction Management of 35 homes in San Jos\u00e9 (Almer\u00eda) 2006 - Ferrer Arquitectos<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project and Construction Management of 35 homes in San Jos\u00e9 (Almer\u00eda) 2006 - Ferrer Arquitectos\" \/>\n<meta property=\"og:description\" content=\"Terrazas de San Jos\u00e9 is a residential development comprising 35 dwellings in San Jos\u00e9, N\u00edjar, set on an irregular site with a pronounced slope between Calle Lepanto, Camino del Aguamarina, and Ronda de San Jos\u00e9. The site&#8217;s topography becomes the project&#8217;s defining architectural element, giving rise to a terraced composition that adapts the dwellings to [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrer Arquitectos\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-25T18:01:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-4-1024x944.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"944\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\\\/\",\"name\":\"Project and Construction Management of 35 homes in San Jos\u00e9 (Almer\u00eda) 2006 - Ferrer Arquitectos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-4.png\",\"datePublished\":\"2025-05-12T21:20:41+00:00\",\"dateModified\":\"2026-06-25T18:01:20+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-4.png\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/00.PORTADA-4.png\",\"width\":2048,\"height\":1888},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project and Construction Management of 35 homes in San Jos\u00e9 (Almer\u00eda) 2006\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"name\":\"Ferrer Arquitectos\",\"description\":\"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.\",\"publisher\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferrerarquitectos.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\",\"name\":\"Ferrer Arquitectos\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"width\":32,\"height\":32,\"caption\":\"Ferrer Arquitectos\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project and Construction Management of 35 homes in San Jos\u00e9 (Almer\u00eda) 2006 - Ferrer Arquitectos","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/","og_locale":"en_US","og_type":"article","og_title":"Project and Construction Management of 35 homes in San Jos\u00e9 (Almer\u00eda) 2006 - Ferrer Arquitectos","og_description":"Terrazas de San Jos\u00e9 is a residential development comprising 35 dwellings in San Jos\u00e9, N\u00edjar, set on an irregular site with a pronounced slope between Calle Lepanto, Camino del Aguamarina, and Ronda de San Jos\u00e9. The site&#8217;s topography becomes the project&#8217;s defining architectural element, giving rise to a terraced composition that adapts the dwellings to [&hellip;]","og_url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/","og_site_name":"Ferrer Arquitectos","article_modified_time":"2026-06-25T18:01:20+00:00","og_image":[{"width":1024,"height":944,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-4-1024x944.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/","url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/","name":"Project and Construction Management of 35 homes in San Jos\u00e9 (Almer\u00eda) 2006 - Ferrer Arquitectos","isPartOf":{"@id":"https:\/\/ferrerarquitectos.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/#primaryimage"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/#primaryimage"},"thumbnailUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-4.png","datePublished":"2025-05-12T21:20:41+00:00","dateModified":"2026-06-25T18:01:20+00:00","breadcrumb":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/#primaryimage","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-4.png","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/00.PORTADA-4.png","width":2048,"height":1888},{"@type":"BreadcrumbList","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/project-and-construction-management-of-33-homes-in-san-jose-almeria-2006\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferrerarquitectos.com\/"},{"@type":"ListItem","position":2,"name":"Project and Construction Management of 35 homes in San Jos\u00e9 (Almer\u00eda) 2006"}]},{"@type":"WebSite","@id":"https:\/\/ferrerarquitectos.com\/#website","url":"https:\/\/ferrerarquitectos.com\/","name":"Ferrer Arquitectos","description":"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.","publisher":{"@id":"https:\/\/ferrerarquitectos.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferrerarquitectos.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ferrerarquitectos.com\/#organization","name":"Ferrer Arquitectos","url":"https:\/\/ferrerarquitectos.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","width":32,"height":32,"caption":"Ferrer Arquitectos"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/"}}]}},"meta_box":{"imagenes":[{"width":150,"height":150,"file":"33-SAN-JOSE-01.jpg","filesize":1136116,"sizes":{"medium":{"file":"33-SAN-JOSE-01-300x225.jpg","width":300,"height":225,"mime-type":"image\/jpeg","filesize":36969,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-300x225.jpg"},"large":{"file":"33-SAN-JOSE-01-1024x769.jpg","width":1024,"height":769,"mime-type":"image\/jpeg","filesize":218188,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-1024x769.jpg"},"thumbnail":{"file":"33-SAN-JOSE-01-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":21942,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-150x150.jpg"},"medium_large":{"file":"33-SAN-JOSE-01-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":137185,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-768x577.jpg"},"et-pb-post-main-image":{"file":"33-SAN-JOSE-01-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":46843,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"33-SAN-JOSE-01-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":204301,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-1080x675.jpg"},"et-pb-portfolio-image":{"file":"33-SAN-JOSE-01-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":50480,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"33-SAN-JOSE-01-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":72901,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"33-SAN-JOSE-01-1080x811.jpg","width":1080,"height":811,"mime-type":"image\/jpeg","filesize":238274,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-1080x811.jpg"},"et-pb-gallery-module-image-portrait":{"file":"33-SAN-JOSE-01-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":67778,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"ID":"127886","name":"33-SAN-JOSE-01.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/33-SAN-JOSE-01.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-01.jpg","title":"33 SAN JOSE 01","caption":"","description":"33 SAN JOSE 01","alt":"","srcset":false},{"width":150,"height":150,"file":"33-SAN-JOSE-02.jpg","filesize":877592,"sizes":{"medium":{"file":"33-SAN-JOSE-02-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":34989,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-300x226.jpg"},"large":{"file":"33-SAN-JOSE-02-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":213192,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-1024x770.jpg"},"thumbnail":{"file":"33-SAN-JOSE-02-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":21327,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-150x150.jpg"},"medium_large":{"file":"33-SAN-JOSE-02-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":133398,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-768x578.jpg"},"et-pb-post-main-image":{"file":"33-SAN-JOSE-02-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":44382,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"33-SAN-JOSE-02-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":199064,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-1080x675.jpg"},"et-pb-portfolio-image":{"file":"33-SAN-JOSE-02-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":47547,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"33-SAN-JOSE-02-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":69424,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"33-SAN-JOSE-02-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":233256,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"33-SAN-JOSE-02-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":70528,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"ID":"127888","name":"33-SAN-JOSE-02.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/33-SAN-JOSE-02.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-02.jpg","title":"33 SAN JOSE 02","caption":"","description":"33 SAN JOSE 02","alt":"","srcset":false},{"width":150,"height":150,"file":"33-SAN-JOSE-03-scaled.jpg","filesize":215543,"sizes":{"medium":{"file":"33-SAN-JOSE-03-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":9887,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-300x112.jpg"},"large":{"file":"33-SAN-JOSE-03-1024x384.jpg","width":1024,"height":384,"mime-type":"image\/jpeg","filesize":36114,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-1024x384.jpg"},"thumbnail":{"file":"33-SAN-JOSE-03-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":8522,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-150x150.jpg"},"medium_large":{"file":"33-SAN-JOSE-03-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":24569,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-768x288.jpg"},"1536x1536":{"file":"33-SAN-JOSE-03-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":70270,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-1536x575.jpg"},"2048x2048":{"file":"33-SAN-JOSE-03-2048x767.jpg","width":2048,"height":767,"mime-type":"image\/jpeg","filesize":135920,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-2048x767.jpg"},"et-pb-post-main-image":{"file":"33-SAN-JOSE-03-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":14926,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"33-SAN-JOSE-03-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":61402,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-1080x675.jpg"},"et-pb-portfolio-image":{"file":"33-SAN-JOSE-03-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":15964,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"33-SAN-JOSE-03-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":21126,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"33-SAN-JOSE-03-1080x405.jpg","width":1080,"height":405,"mime-type":"image\/jpeg","filesize":39198,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-1080x405.jpg"},"et-pb-gallery-module-image-portrait":{"file":"33-SAN-JOSE-03-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":21182,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"original_image":"33-SAN-JOSE-03.jpg","ID":"127890","name":"33-SAN-JOSE-03-scaled.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/33-SAN-JOSE-03-scaled.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-03-scaled.jpg","title":"33 SAN JOSE 03","caption":"","description":"33 SAN JOSE 03","alt":"","srcset":false},{"width":150,"height":150,"file":"33-SAN-JOSE-04.jpg","filesize":2381337,"sizes":{"medium":{"file":"33-SAN-JOSE-04-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":26762,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-300x226.jpg"},"large":{"file":"33-SAN-JOSE-04-1024x771.jpg","width":1024,"height":771,"mime-type":"image\/jpeg","filesize":151612,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-1024x771.jpg"},"thumbnail":{"file":"33-SAN-JOSE-04-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":17154,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-150x150.jpg"},"medium_large":{"file":"33-SAN-JOSE-04-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":95226,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-768x578.jpg"},"1536x1536":{"file":"33-SAN-JOSE-04-1536x1157.jpg","width":1536,"height":1157,"mime-type":"image\/jpeg","filesize":321622,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-1536x1157.jpg"},"2048x2048":{"file":"33-SAN-JOSE-04-2048x1542.jpg","width":2048,"height":1542,"mime-type":"image\/jpeg","filesize":579173,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-2048x1542.jpg"},"et-pb-post-main-image":{"file":"33-SAN-JOSE-04-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":36849,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"33-SAN-JOSE-04-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":160992,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-1080x675.jpg"},"et-pb-portfolio-image":{"file":"33-SAN-JOSE-04-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":37398,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"33-SAN-JOSE-04-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":51397,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"33-SAN-JOSE-04-1080x813.jpg","width":1080,"height":813,"mime-type":"image\/jpeg","filesize":166040,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-1080x813.jpg"},"et-pb-gallery-module-image-portrait":{"file":"33-SAN-JOSE-04-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":54365,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-400x516.jpg"},"et-pb-post-main-image-fullwidth-large":{"file":"33-SAN-JOSE-04-2482x1800.jpg","width":2482,"height":1800,"mime-type":"image\/jpeg","filesize":970210,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-2482x1800.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"ID":"127892","name":"33-SAN-JOSE-04.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/33-SAN-JOSE-04.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-04.jpg","title":"33 SAN JOSE 04","caption":"","description":"33 SAN JOSE 04","alt":"","srcset":false},{"width":150,"height":150,"file":"33-SAN-JOSE-05.jpg","filesize":3017473,"sizes":{"medium":{"file":"33-SAN-JOSE-05-300x212.jpg","width":300,"height":212,"mime-type":"image\/jpeg","filesize":31811,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-300x212.jpg"},"large":{"file":"33-SAN-JOSE-05-1024x724.jpg","width":1024,"height":724,"mime-type":"image\/jpeg","filesize":213870,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-1024x724.jpg"},"thumbnail":{"file":"33-SAN-JOSE-05-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":19945,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-150x150.jpg"},"medium_large":{"file":"33-SAN-JOSE-05-768x543.jpg","width":768,"height":543,"mime-type":"image\/jpeg","filesize":128633,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-768x543.jpg"},"1536x1536":{"file":"33-SAN-JOSE-05-1536x1086.jpg","width":1536,"height":1086,"mime-type":"image\/jpeg","filesize":447593,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-1536x1086.jpg"},"2048x2048":{"file":"33-SAN-JOSE-05-2048x1448.jpg","width":2048,"height":1448,"mime-type":"image\/jpeg","filesize":749150,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-2048x1448.jpg"},"et-pb-post-main-image":{"file":"33-SAN-JOSE-05-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":45179,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"33-SAN-JOSE-05-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":230577,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-1080x675.jpg"},"et-pb-portfolio-image":{"file":"33-SAN-JOSE-05-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":46421,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"33-SAN-JOSE-05-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":71582,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"33-SAN-JOSE-05-1080x764.jpg","width":1080,"height":764,"mime-type":"image\/jpeg","filesize":235895,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-1080x764.jpg"},"et-pb-gallery-module-image-portrait":{"file":"33-SAN-JOSE-05-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":78126,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"ID":"127894","name":"33-SAN-JOSE-05.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/33-SAN-JOSE-05.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-05.jpg","title":"33 SAN JOSE 05","caption":"","description":"33 SAN JOSE 05","alt":"","srcset":false},{"width":150,"height":150,"file":"33-SAN-JOSE-06-scaled.jpg","filesize":198897,"sizes":{"medium":{"file":"33-SAN-JOSE-06-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":12570,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-300x112.jpg"},"large":{"file":"33-SAN-JOSE-06-1024x384.jpg","width":1024,"height":384,"mime-type":"image\/jpeg","filesize":51967,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-1024x384.jpg"},"thumbnail":{"file":"33-SAN-JOSE-06-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":10420,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-150x150.jpg"},"medium_large":{"file":"33-SAN-JOSE-06-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":35075,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-768x288.jpg"},"1536x1536":{"file":"33-SAN-JOSE-06-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":94471,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-1536x575.jpg"},"2048x2048":{"file":"33-SAN-JOSE-06-2048x767.jpg","width":2048,"height":767,"mime-type":"image\/jpeg","filesize":143751,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-2048x767.jpg"},"et-pb-post-main-image":{"file":"33-SAN-JOSE-06-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":20405,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"33-SAN-JOSE-06-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":77678,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-1080x675.jpg"},"et-pb-portfolio-image":{"file":"33-SAN-JOSE-06-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":21999,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"33-SAN-JOSE-06-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":29468,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"33-SAN-JOSE-06-1080x404.jpg","width":1080,"height":404,"mime-type":"image\/jpeg","filesize":57221,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-1080x404.jpg"},"et-pb-gallery-module-image-portrait":{"file":"33-SAN-JOSE-06-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":29648,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-400x516.jpg"},"et-pb-post-main-image-fullwidth-large":{"file":"33-SAN-JOSE-06-2880x1755.jpg","width":2880,"height":1755,"mime-type":"image\/jpeg","filesize":315717,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-2880x1755.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"original_image":"33-SAN-JOSE-06.jpg","ID":"127896","name":"33-SAN-JOSE-06-scaled.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/33-SAN-JOSE-06-scaled.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/33-SAN-JOSE-06-scaled.jpg","title":"33 SAN JOSE 06","caption":"","description":"33 SAN JOSE 06","alt":"","srcset":false}]},"_links":{"self":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new\/125849","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new"}],"about":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/types\/project-new"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media\/127899"}],"wp:attachment":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=125849"}],"wp:term":[{"taxonomy":"categoria_proyecto","embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/categoria_proyecto?post=125849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}