{"id":125835,"date":"2025-05-12T22:20:53","date_gmt":"2025-05-12T21:20:53","guid":{"rendered":"https:\/\/ferrerarquitectos.com\/project-new\/preliminary-project-for-the-judicial-headquarters-in-velez-malaga-malaga-2004\/"},"modified":"2026-07-04T09:28:59","modified_gmt":"2026-07-04T08:28:59","slug":"pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004","status":"publish","type":"project-new","link":"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/","title":{"rendered":"Preliminary Project for Judicial Headquarters in V\u00e9lez-M\u00e1laga (M\u00e1laga) 2004"},"content":{"rendered":"<p class=\"PDq2pG_selectionAnchorContainer\" data-start=\"288\" data-end=\"655\">The New Judicial Courthouse in V\u00e9lez-M\u00e1laga is conceived as a sober and recognizable institutional building, integrated into its urban context through the creation of an entrance plaza facing Huerto Carri\u00f3n Street. This public space acts as a forecourt to the building, organizing visitors&#8217; arrival while reinforcing the civic presence of the complex within the city.<\/p>\n<p data-start=\"657\" data-end=\"1092\">The proposal is organized around two interlocking volumes: a large, rational, and enclosed concrete block, and a smaller timber-clad volume accommodating the building&#8217;s most public functions, including the Civil Registry and the Wedding Hall. The contrast between these materials defines a clear, functional, and durable architecture, balancing the institutional solidity of concrete with the warmer, more approachable scale of timber.<\/p>\n<p data-start=\"1094\" data-end=\"1559\">Internal circulation is a key organizing principle of the project. The building clearly separates the movement of visitors, staff, detainees, and other specific user groups, ensuring an efficient and secure functional organization. A generous internal ramp connects the two principal levels, transforming circulation into a fluid, accessible, and continuous spatial experience while bringing the courtroom level into direct relationship with the main entrance hall.<\/p>\n<p data-start=\"1561\" data-end=\"1973\">Natural light plays a fundamental role in the architectural concept. The south and west fa\u00e7ades incorporate prefabricated concrete louvers that filter daylight while preserving interior privacy. At the same time, four internal courtyards puncture the main volume, bringing natural light and ventilation into the workspaces while maintaining visual independence between departments through translucent enclosures.<\/p>\n<p data-start=\"1975\" data-end=\"2323\" data-is-last-node=\"\" data-is-only-node=\"\">Functionally, the upper floor accommodates the Courts of First Instance and Investigation, while the lower level concentrates the principal public services and complementary facilities. With a usable floor area of 3,042.57 m\u00b2 and a total built area of 3,538.43 m\u00b2, the project delivers a compact, accessible, and highly efficient judicial facility.<\/p>\n<p data-start=\"1649\" data-end=\"1924\"><strong data-start=\"1444\" data-end=\"1462\">TECHNICAL DATA<\/strong><\/p>\n<ul>\n<li data-start=\"1464\" data-end=\"1717\">BUILDING: JUDICIAL COURTHOUSE (2002)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">PROJECT ARCHITECT: JOS\u00c9 \u00c1NGEL FERRER<\/li>\n<li data-start=\"1464\" data-end=\"1717\">CLIENT: MINISTRY OF JUSTICE OF THE REGIONAL GOVERNMENT OF ANDALUSIA<\/li>\n<li data-start=\"1464\" data-end=\"1717\">LOCATION: V\u00c9LEZ-M\u00c1LAGA (M\u00c1LAGA)<\/li>\n<li data-start=\"1464\" data-end=\"1717\">GROSS FLOOR AREA: 3.538 m\u00b2<\/li>\n<\/ul>\n","protected":false},"featured_media":127972,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"categoria_proyecto":[91],"class_list":["post-125835","project-new","type-project-new","status-publish","has-post-thumbnail","hentry","categoria_proyecto-offices"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Preliminary Project for Judicial Headquarters in V\u00e9lez-M\u00e1laga (M\u00e1laga) 2004 - Ferrer Arquitectos<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Preliminary Project for Judicial Headquarters in V\u00e9lez-M\u00e1laga (M\u00e1laga) 2004 - Ferrer Arquitectos\" \/>\n<meta property=\"og:description\" content=\"The New Judicial Courthouse in V\u00e9lez-M\u00e1laga is conceived as a sober and recognizable institutional building, integrated into its urban context through the creation of an entrance plaza facing Huerto Carri\u00f3n Street. This public space acts as a forecourt to the building, organizing visitors&#8217; arrival while reinforcing the civic presence of the complex within the city. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrer Arquitectos\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-04T08:28:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-00-1024x1024.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\\\/\",\"name\":\"Preliminary Project for Judicial Headquarters in V\u00e9lez-M\u00e1laga (M\u00e1laga) 2004 - Ferrer Arquitectos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/JUDICIAL-VELEZ-MALAGA-00.png\",\"datePublished\":\"2025-05-12T21:20:53+00:00\",\"dateModified\":\"2026-07-04T08:28:59+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/JUDICIAL-VELEZ-MALAGA-00.png\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/JUDICIAL-VELEZ-MALAGA-00.png\",\"width\":2048,\"height\":2048},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/en\\\/project-en\\\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Preliminary Project for Judicial Headquarters in V\u00e9lez-M\u00e1laga (M\u00e1laga) 2004\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#website\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"name\":\"Ferrer Arquitectos\",\"description\":\"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.\",\"publisher\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferrerarquitectos.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#organization\",\"name\":\"Ferrer Arquitectos\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"contentUrl\":\"https:\\\/\\\/ferrerarquitectos.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/favicon.png\",\"width\":32,\"height\":32,\"caption\":\"Ferrer Arquitectos\"},\"image\":{\"@id\":\"https:\\\/\\\/ferrerarquitectos.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Preliminary Project for Judicial Headquarters in V\u00e9lez-M\u00e1laga (M\u00e1laga) 2004 - Ferrer Arquitectos","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/","og_locale":"en_US","og_type":"article","og_title":"Preliminary Project for Judicial Headquarters in V\u00e9lez-M\u00e1laga (M\u00e1laga) 2004 - Ferrer Arquitectos","og_description":"The New Judicial Courthouse in V\u00e9lez-M\u00e1laga is conceived as a sober and recognizable institutional building, integrated into its urban context through the creation of an entrance plaza facing Huerto Carri\u00f3n Street. This public space acts as a forecourt to the building, organizing visitors&#8217; arrival while reinforcing the civic presence of the complex within the city. [&hellip;]","og_url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/","og_site_name":"Ferrer Arquitectos","article_modified_time":"2026-07-04T08:28:59+00:00","og_image":[{"width":1024,"height":1024,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-00-1024x1024.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/","url":"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/","name":"Preliminary Project for Judicial Headquarters in V\u00e9lez-M\u00e1laga (M\u00e1laga) 2004 - Ferrer Arquitectos","isPartOf":{"@id":"https:\/\/ferrerarquitectos.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/#primaryimage"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/#primaryimage"},"thumbnailUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-00.png","datePublished":"2025-05-12T21:20:53+00:00","dateModified":"2026-07-04T08:28:59+00:00","breadcrumb":{"@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/#primaryimage","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-00.png","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-00.png","width":2048,"height":2048},{"@type":"BreadcrumbList","@id":"https:\/\/ferrerarquitectos.com\/en\/project-en\/pre-project-of-judicial-headquarters-in-velez-malaga-malaga-2004\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferrerarquitectos.com\/"},{"@type":"ListItem","position":2,"name":"Preliminary Project for Judicial Headquarters in V\u00e9lez-M\u00e1laga (M\u00e1laga) 2004"}]},{"@type":"WebSite","@id":"https:\/\/ferrerarquitectos.com\/#website","url":"https:\/\/ferrerarquitectos.com\/","name":"Ferrer Arquitectos","description":"Bienvenidos a la p\u00e1gina web de Ferrer Arquitectos. M\u00e1s de 25 a\u00f1os haciendo arquitectura. Dise\u00f1o arquitect\u00f3nico basado en la luz y la sostenibilidad: Viviendas, Oficinas, Museos, Edificios singulares y m\u00e1s.","publisher":{"@id":"https:\/\/ferrerarquitectos.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferrerarquitectos.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ferrerarquitectos.com\/#organization","name":"Ferrer Arquitectos","url":"https:\/\/ferrerarquitectos.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","contentUrl":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/2015\/12\/favicon.png","width":32,"height":32,"caption":"Ferrer Arquitectos"},"image":{"@id":"https:\/\/ferrerarquitectos.com\/#\/schema\/logo\/image\/"}}]}},"meta_box":{"imagenes":[{"width":150,"height":150,"file":"JUDICIAL-VELEZ-MALAGA-01.jpg","filesize":1814406,"sizes":{"medium":{"file":"JUDICIAL-VELEZ-MALAGA-01-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":19067,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-300x226.jpg"},"large":{"file":"JUDICIAL-VELEZ-MALAGA-01-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":121284,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-1024x770.jpg"},"thumbnail":{"file":"JUDICIAL-VELEZ-MALAGA-01-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":11776,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-150x150.jpg"},"medium_large":{"file":"JUDICIAL-VELEZ-MALAGA-01-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":73243,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-768x578.jpg"},"1536x1536":{"file":"JUDICIAL-VELEZ-MALAGA-01-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":258312,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-1536x1155.jpg"},"et-pb-post-main-image":{"file":"JUDICIAL-VELEZ-MALAGA-01-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":23300,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"JUDICIAL-VELEZ-MALAGA-01-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":110753,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-1080x675.jpg"},"et-pb-portfolio-image":{"file":"JUDICIAL-VELEZ-MALAGA-01-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":25133,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"JUDICIAL-VELEZ-MALAGA-01-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":37125,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"JUDICIAL-VELEZ-MALAGA-01-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":136346,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"JUDICIAL-VELEZ-MALAGA-01-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":36718,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"ID":"127973","name":"JUDICIAL-VELEZ-MALAGA-01.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-01.jpg","title":"JUDICIAL VELEZ-MALAGA 01","caption":"","description":"JUDICIAL VELEZ-MALAGA 01","alt":"","srcset":false},{"width":150,"height":150,"file":"JUDICIAL-VELEZ-MALAGA-02.jpg","filesize":1227650,"sizes":{"medium":{"file":"JUDICIAL-VELEZ-MALAGA-02-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":27928,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-300x226.jpg"},"large":{"file":"JUDICIAL-VELEZ-MALAGA-02-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":161022,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-1024x770.jpg"},"thumbnail":{"file":"JUDICIAL-VELEZ-MALAGA-02-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":16606,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-150x150.jpg"},"medium_large":{"file":"JUDICIAL-VELEZ-MALAGA-02-768x577.jpg","width":768,"height":577,"mime-type":"image\/jpeg","filesize":101144,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-768x577.jpg"},"et-pb-post-main-image":{"file":"JUDICIAL-VELEZ-MALAGA-02-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":35972,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"JUDICIAL-VELEZ-MALAGA-02-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":153275,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-1080x675.jpg"},"et-pb-portfolio-image":{"file":"JUDICIAL-VELEZ-MALAGA-02-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":38362,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"JUDICIAL-VELEZ-MALAGA-02-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":53897,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"JUDICIAL-VELEZ-MALAGA-02-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":175429,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"JUDICIAL-VELEZ-MALAGA-02-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":47960,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"ID":"127975","name":"JUDICIAL-VELEZ-MALAGA-02.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-02.jpg","title":"JUDICIAL VELEZ-MALAGA 02","caption":"","description":"JUDICIAL VELEZ-MALAGA 02","alt":"","srcset":false},{"width":150,"height":150,"file":"JUDICIAL-VELEZ-MALAGA-03.jpg","filesize":1162072,"sizes":{"medium":{"file":"JUDICIAL-VELEZ-MALAGA-03-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":16467,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-300x112.jpg"},"large":{"file":"JUDICIAL-VELEZ-MALAGA-03-1024x384.jpg","width":1024,"height":384,"mime-type":"image\/jpeg","filesize":85774,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-1024x384.jpg"},"thumbnail":{"file":"JUDICIAL-VELEZ-MALAGA-03-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":13893,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-150x150.jpg"},"medium_large":{"file":"JUDICIAL-VELEZ-MALAGA-03-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":53570,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-768x288.jpg"},"1536x1536":{"file":"JUDICIAL-VELEZ-MALAGA-03-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":173367,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-1536x575.jpg"},"et-pb-post-main-image":{"file":"JUDICIAL-VELEZ-MALAGA-03-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":30088,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"JUDICIAL-VELEZ-MALAGA-03-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":144615,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-1080x675.jpg"},"et-pb-portfolio-image":{"file":"JUDICIAL-VELEZ-MALAGA-03-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":33271,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"JUDICIAL-VELEZ-MALAGA-03-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":49175,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"JUDICIAL-VELEZ-MALAGA-03-1080x404.jpg","width":1080,"height":404,"mime-type":"image\/jpeg","filesize":94358,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-1080x404.jpg"},"et-pb-gallery-module-image-portrait":{"file":"JUDICIAL-VELEZ-MALAGA-03-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":54361,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"ID":"127977","name":"JUDICIAL-VELEZ-MALAGA-03.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-03.jpg","title":"JUDICIAL VELEZ-MALAGA 03","caption":"","description":"JUDICIAL VELEZ-MALAGA 03","alt":"","srcset":false},{"width":150,"height":150,"file":"JUDICIAL-VELEZ-MALAGA-04.jpg","filesize":2025472,"sizes":{"medium":{"file":"JUDICIAL-VELEZ-MALAGA-04-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":27857,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-300x226.jpg"},"large":{"file":"JUDICIAL-VELEZ-MALAGA-04-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":150928,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-1024x770.jpg"},"thumbnail":{"file":"JUDICIAL-VELEZ-MALAGA-04-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":16584,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-150x150.jpg"},"medium_large":{"file":"JUDICIAL-VELEZ-MALAGA-04-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":95925,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-768x578.jpg"},"1536x1536":{"file":"JUDICIAL-VELEZ-MALAGA-04-1536x1155.jpg","width":1536,"height":1155,"mime-type":"image\/jpeg","filesize":301624,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-1536x1155.jpg"},"et-pb-post-main-image":{"file":"JUDICIAL-VELEZ-MALAGA-04-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":35404,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"JUDICIAL-VELEZ-MALAGA-04-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":143966,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-1080x675.jpg"},"et-pb-portfolio-image":{"file":"JUDICIAL-VELEZ-MALAGA-04-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":37305,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"JUDICIAL-VELEZ-MALAGA-04-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":52616,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"JUDICIAL-VELEZ-MALAGA-04-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":164525,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"JUDICIAL-VELEZ-MALAGA-04-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":50620,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"ID":"127979","name":"JUDICIAL-VELEZ-MALAGA-04.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-04.jpg","title":"JUDICIAL VELEZ-MALAGA 04","caption":"","description":"JUDICIAL VELEZ-MALAGA 04","alt":"","srcset":false},{"width":150,"height":150,"file":"JUDICIAL-VELEZ-MALAGA-05.jpg","filesize":1031579,"sizes":{"medium":{"file":"JUDICIAL-VELEZ-MALAGA-05-300x226.jpg","width":300,"height":226,"mime-type":"image\/jpeg","filesize":22611,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-300x226.jpg"},"large":{"file":"JUDICIAL-VELEZ-MALAGA-05-1024x770.jpg","width":1024,"height":770,"mime-type":"image\/jpeg","filesize":146418,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-1024x770.jpg"},"thumbnail":{"file":"JUDICIAL-VELEZ-MALAGA-05-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":13889,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-150x150.jpg"},"medium_large":{"file":"JUDICIAL-VELEZ-MALAGA-05-768x578.jpg","width":768,"height":578,"mime-type":"image\/jpeg","filesize":86820,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-768x578.jpg"},"et-pb-post-main-image":{"file":"JUDICIAL-VELEZ-MALAGA-05-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":28622,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"JUDICIAL-VELEZ-MALAGA-05-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":132382,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-1080x675.jpg"},"et-pb-portfolio-image":{"file":"JUDICIAL-VELEZ-MALAGA-05-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":30648,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"JUDICIAL-VELEZ-MALAGA-05-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":44055,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"JUDICIAL-VELEZ-MALAGA-05-1080x812.jpg","width":1080,"height":812,"mime-type":"image\/jpeg","filesize":161390,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-1080x812.jpg"},"et-pb-gallery-module-image-portrait":{"file":"JUDICIAL-VELEZ-MALAGA-05-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":44284,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"ID":"127981","name":"JUDICIAL-VELEZ-MALAGA-05.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-05.jpg","title":"JUDICIAL VELEZ-MALAGA 05","caption":"","description":"JUDICIAL VELEZ-MALAGA 05","alt":"","srcset":false},{"width":150,"height":150,"file":"JUDICIAL-VELEZ-MALAGA-06.jpg","filesize":993173,"sizes":{"medium":{"file":"JUDICIAL-VELEZ-MALAGA-06-300x112.jpg","width":300,"height":112,"mime-type":"image\/jpeg","filesize":16186,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-300x112.jpg"},"large":{"file":"JUDICIAL-VELEZ-MALAGA-06-1024x384.jpg","width":1024,"height":384,"mime-type":"image\/jpeg","filesize":72641,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-1024x384.jpg"},"thumbnail":{"file":"JUDICIAL-VELEZ-MALAGA-06-150x150.jpg","width":150,"height":150,"mime-type":"image\/jpeg","filesize":12810,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-150x150.jpg"},"medium_large":{"file":"JUDICIAL-VELEZ-MALAGA-06-768x288.jpg","width":768,"height":288,"mime-type":"image\/jpeg","filesize":47956,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-768x288.jpg"},"1536x1536":{"file":"JUDICIAL-VELEZ-MALAGA-06-1536x575.jpg","width":1536,"height":575,"mime-type":"image\/jpeg","filesize":138644,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-1536x575.jpg"},"et-pb-post-main-image":{"file":"JUDICIAL-VELEZ-MALAGA-06-400x250.jpg","width":400,"height":250,"mime-type":"image\/jpeg","filesize":28086,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-400x250.jpg"},"et-pb-post-main-image-fullwidth":{"file":"JUDICIAL-VELEZ-MALAGA-06-1080x675.jpg","width":1080,"height":675,"mime-type":"image\/jpeg","filesize":117525,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-1080x675.jpg"},"et-pb-portfolio-image":{"file":"JUDICIAL-VELEZ-MALAGA-06-400x284.jpg","width":400,"height":284,"mime-type":"image\/jpeg","filesize":29300,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-400x284.jpg"},"et-pb-portfolio-module-image":{"file":"JUDICIAL-VELEZ-MALAGA-06-510x382.jpg","width":510,"height":382,"mime-type":"image\/jpeg","filesize":41321,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-510x382.jpg"},"et-pb-portfolio-image-single":{"file":"JUDICIAL-VELEZ-MALAGA-06-1080x404.jpg","width":1080,"height":404,"mime-type":"image\/jpeg","filesize":79666,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-1080x404.jpg"},"et-pb-gallery-module-image-portrait":{"file":"JUDICIAL-VELEZ-MALAGA-06-400x516.jpg","width":400,"height":516,"mime-type":"image\/jpeg","filesize":38473,"url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-400x516.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"1","keywords":[],"alt":""},"ID":"127983","name":"JUDICIAL-VELEZ-MALAGA-06.jpg","path":"\/var\/www\/vhosts\/ferrerarquitectos.com\/httpdocs\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06.jpg","url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06-150x150.jpg","full_url":"https:\/\/ferrerarquitectos.com\/wp-content\/uploads\/JUDICIAL-VELEZ-MALAGA-06.jpg","title":"JUDICIAL VELEZ-MALAGA 06","caption":"","description":"JUDICIAL VELEZ-MALAGA 06","alt":"","srcset":false}]},"_links":{"self":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new\/125835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/project-new"}],"about":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/types\/project-new"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media\/127972"}],"wp:attachment":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=125835"}],"wp:term":[{"taxonomy":"categoria_proyecto","embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/categoria_proyecto?post=125835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}