{"id":125452,"date":"2011-02-04T15:42:53","date_gmt":"2011-02-04T14:42:53","guid":{"rendered":"https:\/\/ferrerarquitectos.com\/grinan-inaugurates-the-pita\/"},"modified":"2011-02-04T15:42:53","modified_gmt":"2011-02-04T14:42:53","slug":"grinan-inaugurates-the-pita","status":"publish","type":"post","link":"https:\/\/ferrerarquitectos.com\/en\/grinan-inaugurates-the-pita\/","title":{"rendered":"Gri\u00f1\u00e1n Inaugurates the PITA"},"content":{"rendered":"<p>The President of the Regional Government of Andalusia, Jos\u00e9 Antonio Gri\u00f1\u00e1n, inaugurates the PITA (Science and Technology Park of Almer\u00eda), where the central headquarters of PITA and TECNOVA are currently being built, a project by FERRER ARQUITECTOS. The 20,000 m\u00b2 building has been designed with sustainability criteria, with special attention to the incorporation of natural light. It is in the structural phase and among its unique features is the design of a marble slat facade in collaboration with the CTAP. Jos\u00e9 Antonio Gri\u00f1\u00e1n was talking with Jos\u00e9 \u00c1ngel Ferrer about some of the characteristics of the building.   <\/p>\n<p><a href=\"https:\/\/ferrerarquitectos.com\/project\/edificio-pita\/\">PITA Building Project<\/a><\/p>\n<p><a href=\"https:\/\/ferrerarquitectos.com\/en\/ferrer-arquitectos-and-pita-in-soyouknowbetter\/\">Other publications about the PITA Building<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The President of the Regional Government of Andalusia, Jos\u00e9 Antonio Gri\u00f1\u00e1n, inaugurates the PITA (Science and Technology Park of Almer\u00eda), where the central headquarters of PITA and TECNOVA are currently being built, a project by FERRER ARQUITECTOS. The 20,000 m\u00b2 building has been designed with sustainability criteria, with special attention to the incorporation of natural [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":123608,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[4],"tags":[],"class_list":["post-125452","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria"],"acf":[],"meta_box":[],"_links":{"self":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/125452","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/comments?post=125452"}],"version-history":[{"count":0,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/125452\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media\/123608"}],"wp:attachment":[{"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=125452"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/categories?post=125452"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ferrerarquitectos.com\/en\/wp-json\/wp\/v2\/tags?post=125452"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}